1) building tailing dam by installments
分期筑坝
1.
It was shown that the method of building tailing dam by installments should be the key method of building tailing dam.
分析了上游式尾矿筑坝方法的安全隐患 ,指出分期筑坝方法应是未来尾矿库建设的发展方向。
2) substage construction
分期浇筑
3) staged-filling
分期填筑
1.
Research on staged-filling scheme about concrete-faced rockfill dam of Hongjiadu hydropower station;
洪家渡面板堆石坝分期填筑方案研究
2.
Taking the design of one three hundred meters level face rockfill dam for example, the system executes muti-scheme Rapid numerical analysis for dam staged-filling;Taking one earth-rock dam for example, the system execute the automatic selection of monitoring profiles, monitoring points layout visualization based on the intellectualization d
以某300米级高面板堆石坝为例,对其分期填筑过程进行多方案快速数值分析;以某土石坝为例,对其进行基于智能化监测设计系统的大坝监测剖面自动选取、监测点的可视化布置。
4) filling by stages
填筑分期
1.
On the foundation of analyzing factors influence to filling by stages, the writer has summed up some thought questions of dam body filling design by stages of concrete face rock-fill dams built on narrow rivers.
简述了洪家渡水电站面板堆石坝坝体填筑分期设计 ,分析了影响填筑分期的因素 ,总结了狭窄河床高面板堆石坝坝体填筑分期设计应考虑的问题是 :导流与度汛方式 ;地形条件及施工道路布置 ;施工强度与工期要求 ;面板分期原则及坝体临时断面的宽度和坡度等。
5) stage construction
分期建筑
6) damming
[英][dæm] [美][dæm]
筑坝
1.
In light of the difficult problems of fine tailings damming in Jianshan concentrator, the damming technology are applied successfully using hydrocyclone to fine tailings damming through selection of design schemes.
针对尖山尾矿坝筑坝过程中存在的难题 ,通过工艺设计选型 ,成功地将水力旋流器筑坝工艺应用在细粒尾矿筑坝中 ,并与分散放矿相结合 ,取得了良好的效
2.
The theoretical formula by cross-area method for measurement of earthwork and stonework quantities in dredging and damming works with trapezium cross section is derived.
推导了梯形横断面的航道疏浚和筑坝工程采用断面面积法进行土石方计量的理论公式 ,通过误差分析 ,得出现行计算公式存在理论正误差 ,提出了减少计量误差措施。
补充资料:钢铁厂矿山利用尾矿筑尾矿坝
钢铁厂矿山利用尾矿筑尾矿坝
钢铁厂矿山利用尾矿筑尾矿坝
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条