说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 词典 -> 开发风险
1)  developing risk
开发风险
1.
The developing background of BORA A4 starter is introduced and the necessities of developing risk existance and importance of risk analysis are expounded in this paper.
介绍BoraA4起动机开发背景 ,阐明开发风险存在的必然性与风险分析的重要性。
2.
The function and avail of the brim product are discussed and the measure which is used to reduce the new product developing risk is also proposed.
阐述了新产品开发的重要性和必要性,开发新产品应遵循的原则及开发策略,论述了边缘产品的功能和效用,提出了降低新产品开发风险的措施。
2)  development risk
开发风险
1.
It is helpful to reduction of development risk to think through reservoir evaluation by probing into and summing up problems in field development.
研究和总结油气田开发中出现的问题 ,进而反思油气藏评价工作 ,有利于降低开发风险
3)  risk of exploration project
开发项目风险
4)  risky survey and exploitation
风险勘查开发
5)  development risk on new product
新产品开发风险
6)  Property development risk
房地产开发风险
补充资料:海上油气勘探开发风险分析
      海上油气勘探时投资回收和利润的预计和分析。海上油气勘探、开发投资大,不肯定的因素较多,迄今还只能根据从地球物理方法和钻探所得的资料、探区的地质位置及周围的条件,来判断勘探开发的可能成功率。通常对影响投资和利润的各种主要因素的出现概率,用博奕论中的蒙特卡洛模型和概率模型等数学模型,进行分析,来评价油气勘探开发方案。
  
  海上钻井比陆上钻同样深度的井成本要高好几倍,每口井往往高达500~1000万美元,而且成功率较低,即使在浅海区,使用最新的技术,其成功率也只有一半。因此,一般采取尽量少钻井,多做地震工作。用地震船边航行边放炮,比陆上钻眼放炮简便易行,成本低。在此基础上利用本海域所获全部地质资料,可判断出较佳的钻探地点。所钻的井可同时用作勘探与生产,根据钻井结果再进行地震,取得必需资料,尽量减少勘探的总费用。
  
  建成一个海上油气田需要7~10年,建设平台以及采油、集输和处理等装置需要大量资金,往往要花费几十亿美元,而在3~7年后才能取得收益。开发时应根据油气储量,来决定平台的数量、大小与方式;输油用船还是用管道。在开采过程中,还要考虑到市场的需要、油气价格变动等经济和政治因素的变化。一发现储量丰富的油田,就立即投入开发,尽快地回收资金,再勘探新目标。
  

说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条