2) design of reservoir inundation treatment
水库淹没处理设计
3) reservoir inundation
水库淹没
1.
Due to the influence of the reservoir inundation, most of the reservoir s resettler are the rural people, and there will have 46009 people need to be resettle till 2013, and 43602 of them are rural resettler,.
糯扎渡水电站水库淹没影响中,农业人口占绝大多数,设计水平年动迁移民46009人中,农业人口为43602人,占95%,农村移民安置是电站建设成败的关键。
4) inundation treatment
淹没处理
1.
Reservoir inundation treatment is important in the construction of a hydropower station,of which the planning of special facilities is one of the important components.
水库淹没处理是水电站建设的一项重要工作,在水库淹没处理中库区专业项目的规划处理是其中的重要组成部分,专项工程的投资在一些水电站的建设中有时占有相当大的比例。
5) reservoir submerged area
水库淹没区
1.
In this paper,the basic concept of the reservoir submerged area is introduced.
介绍了水库淹没区的基本概念,分析了传统基于二维的水库淹没区范围和基于DEM模型的水库淹没区范围2种计算方法的不足,及它们计算水库淹没区范围存在误差的原因。
6) reservoir flood area
水库淹没范围
1.
A GIS-based method for reservoir flood area calculation and damage evaluation based on the digital elevation model (DEM) and backwater information is described.
介绍了基于地理信息系统(GIS)技术和数字高程模型栅格图像与回水位数据计算水库淹没范围及评估淹没损失的方法,以便使水库淹没处理工作更加科学与合理。
补充资料:水库淹没界线测量
测设移民线、土地征用线、土地利用线、水库清理线等各种水库淹没、防护、利用界线工作的总称。这些界线以设计正常蓄水位为基础,结合浸没、坍岸、风浪影响等因素综合确定,根据需要测设其中的一种、几种或全部。测设时,用界桩在实地标出其通过的位置并绘在适当比例尺的地形图上,作为移民规划、迁移安置及库区建设的依据。界桩分为永久桩和临时桩两类。界线通过厂矿区或居民点时,在进出处各设一个永久桩,内部每隔若干米测设一个临时桩,主要街道标出界线通过的实际位置。大片农田及经济价值较高的林区,一般每隔2~3km测设一个永久桩,再以临时桩加密到能互相通视。只有少量庄稼的山地,可只测设临时桩显示界线通过的位置。经查勘确定不予利用的永久冻土地、大片沼泽地、陡峭坡地等经济价值很低的地区,可不测设界桩。界桩测设工作由测量人员配合水库设计人员和地方、移民等有关单位协同进行,用水准仪或经纬仪分段按设计高程在实地标定,随测随将界桩及标志移交地方保管。