1) fluctuation growth rate
涨落长大速率
2) rising/fall rate
涨落率
1.
The rising/fall rate of design flood graph is also the rising/fall rate of design H~Q curve,based on which the design H~Q curve can be determined.
探讨了水利工程设计时常采用一条所谓综合H~Q曲线存在的误区,H~Q和洪水一样,有设计洪水,就有相应的设计H~Q曲线,它是和设计洪水配套的,设计洪水过程线的涨落率,也是设计H~Q的涨落率,由此求设计H~Q曲线。
3) fluctuation in exchange
汇率涨落
5) velocity of flood and ebb
涨落潮流速
6) silt rate
淤涨速率
补充资料:长大
1.体貌高大壮伟。 2.指体貌高大壮伟的人。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条