说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 词典 -> T构施工
1)  construction of T-bridge
T构施工
2)  precast T-beam
预制T梁施工
3)  shield construction
盾构施工
1.
Discussion ground setting in the shield construction;
浅谈盾构施工中的地面沉降
2.
Numerical analysis of the instability of excavation face in shield construction;
盾构施工中开挖面失稳数值分析
3.
A comparison and analysis of various types of grou- ting behind segment in shield construction;
盾构施工中管片壁后注浆类型的比较分析
4)  structure construction
结构施工
1.
On several factors should be noticed in structure construction supervision;
浅谈结构施工监理中应注意的一些因素
2.
In this paper from the aspect of structure construction the factors influencing the reliability of reinforced concrete structure are preliminarily discussed.
针对结构施工是建筑物可靠性控制中极其关键的环节,从结构施工角度出发,初步探讨了影响钢筋混凝土结构可靠性的因素,并提出了几点规范结构施工的建议,以供参考借鉴。
3.
It points out the problems generated in the use of instructional building,gets the representation from the architectural design,equipment setting,structure construction,etc,and puts forward the main contents should attention in the design,construction,setting,maintain of this kind of architecture,to avoid the generation of safety accident and decrease the quantity of after maintain.
指出在学校教学楼建筑使用过程中出现的问题,从建筑设计、设备安装、结构施工等方面进行了阐述,提出这类建筑在设计、施工、安装、维护等方面需要注意的主要内容,以避免安全事故的发生和减少后期维护的工作量。
5)  structural construction
结构施工
1.
Considerations for structural construction in locomotive laboratory;
机车实验室结构施工中的几点思考
2.
The article presents the reinforcement and structural construction of the cross tunnel and pump station of the running tunnel between Lancun Rd station and Pudongnan Rd station of Mingzhu Line of Shanghai Metro,which are assisted by horizontal freezing.
主要介绍了上海地铁明珠线蓝村路站-浦东南路站区间隧道联络通道、泵站采用水平冻结加固情况下,隧道支护及结构施工过程,分析了隧道内矿山法施工旁通道对地表及隧道结构产生的影响及解决措施,指出了矿山法施工技术在市政及地铁工程施工中的技术可行性。
6)  Shield tunneling
盾构施工
1.
Numerical analysis of the varying law of tunnel surrounding soil displacement produced by shield tunneling;
盾构施工触发隧道周围土体位移变化规律的数值模拟分析
2.
Preliminary study of typical fault diagnosis in shield tunneling
盾构施工典型故障诊断初步研究
3.
Shield tunneling is characterized by quicker speed and higher quality,affecting slightly on the environ- ment and with higher construction security.
盾构法隧道施工,掘进速度快、质量优、对周围环境影响小、施工安全性相对较高,但盾构施工技术有着自身的特点,安全管理工作只有适应盾构施工的特点,才能利用盾构的优势、克服传统隧道施工的劣势,真正做好建筑施工企业的安全工作。
补充资料:施工企业技术组织措施计划(见施工企业技术)


施工企业技术组织措施计划(见施工企业技术)
technical and organize measurement plan in construction enterprise

施工企业技术组织措施杯茹”岑,~‘_:_,organize measurement plan in eonstruetionenterPrise)见施工企业技米管理基本制度。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条