1) external grouting technique of cast in place piles
灌注桩压浆工法
2) cast-in-place pile with grouting at pile-bottom
桩底压浆灌注桩
3) peg filled by pressure
压力注浆灌筑桩
4) bored grouting pile
钻孔压浆灌注桩
1.
By discussing executing process of bored grouting pile, the paper points out reasons and preventive measures of quality problems.
通过钻孔压浆灌注桩施工工艺的论述 ,指出了产生质量问题的原因及防治措施。
5) post grouting for cast-in-situ pile
灌注桩后压浆
1.
Engineering application and theoretical research on post grouting for cast-in-situ piles;
灌注桩后压浆技术的工程实践及理论研究
6) post grouting bored pile
后压浆灌注桩
1.
Taking the pile foundation design of post grouting bored pile with an engineering project in Taiyuan City, this paper introduces the design modification in the new code on post grouting bored pile and some problems needing attentions in the pile foundation design on liquefaction site.
以太原某工程后压浆灌注桩的桩基设计为例,详细介绍了新规范对于后压浆灌注桩的设计修正及在液化场地中桩基设计需要注意的问题。
补充资料:经皮肾盂穿刺灌注测压法
经皮肾盂穿刺灌注测压法
〗1973年Whitaker首先介绍这种检查方法,故也称为“Whitaker试验”。在透视或超声指导下经皮穿刺肾盂,置入一测压导管,先作一次测压(为肾盂静止压与导管阻力压
1973年Whitaker首先介绍这种检查方法,故也称为“Whitaker试验”。在透视或超声指导下经皮穿刺肾盂,置入一测压导管,先作一次测压(为肾盂静止压与导管阻力压),同时经尿道插管记录膀胱压,以10ml/s的流量向肾盂内灌注生理盐水,至平衡状态或压力陡增时为止。记录此时的肾盂灌注压,用此值减去肾盂静止压及膀胱压即为肾盂灌注时的相对压力。正常此值应小于1.18kPa(12cmH2O)。此压力越高,说明上尿路梗阻愈重,可以检出上尿路早期梗阻的存在或除外梗阻。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条