1) seismic risk level
地震风险水平
2) earthquake risk
地震风险
1.
Evaluation on earthquake risk of city buildings by life-cycle cost method;
寿命周期成本法评价城市建筑物地震风险
2.
In this paper, the earthquake risk in Anhui and East China is assessed by use of the information diffusion pattern in two aspects of annual earthquake frequency and annual maximum earthquake.
本文利用信息扩散模式,分别从年地震频次和年最大震级两个方面对安徽及华东地区的地震风险进行评估。
3.
There is huge earthquake risk in China.
我国存在巨大的地震风险,借鉴国际经验,认识国内地震保险各环节的缺陷十分重要。
3) seismic risk
地震风险
1.
Research on seismic risk analysis of wood structural house
木结构房屋的地震风险分析研究
2.
Seismic fragility analysis is one of the three issues (seismic hazard analysis, seismic fragility analysis and seismic loss assessment) in seismic risk analysis.
地震易损性分析是地震风险研究中的三个(地震危险性分析、地震易损性分析和地震灾害损失评估)主要方面之一,可以预测大坝-地基系统在不同等级地震荷载作用下发生各级破损的概率。
3.
The seismic risk estimation for buildings is one of the most important parts of urban earthquake disaster planning.
建筑物地震风险估计逐渐成为城市抗震防灾减灾工作中的一个重要的组成部分,准确估计出建筑物所面临的地震风险的大小对于提高城市综合抗震防灾能力,减轻地震灾害中由于建筑物的破坏导致的人员伤亡和财产损失有着非常重要的意义。
5) risk level
风险水平
1.
Analysis of risk level of typhoon based on P-Ⅲdistribution function;
基于P-Ⅲ型分布函数的台风风险水平分析
2.
The method is good to search for the optimal project time-cost trade-off profiles under different risk levels, to provide an insight into the optimal balance of time and cost, and to give the decision makers the relevant data to practice.
该算法能较好的寻找项目在不同风险水平下的工期——成本优化的最优解,同时能深入分析工期 和成本的理想平衡点,为决策者提供相关信息,用于指导实践。
3.
This paper examines the impact of the risk-based capital requirement on the capital and risk level of large-and-medium-sized commercial banks in China.
本文实证研究了以风险为基础的资本要求对我国大中型银行资本、风险水平变化的影响。
6) horizontal earthquake
水平地震
1.
Pushover analysis of high-rise building with stagger transfer structure during the horizontal earthquake
水平地震作用下错位转换高层建筑结构的Pushover分析
2.
Torsional response of high-rise building with stagger transfer structure during horizontal earthquake
错位转换高层建筑结构水平地震作用下的扭转反应研究
补充资料:风险投资的风险
风险投资的风险是指投资活动中人们不希望的后果出现的潜在可能性。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条