说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 词典 -> 部分预应力框架梁
1)  partial prestressing framed beam
部分预应力框架梁
2)  unbonded partially prestressed concrete flat-beam frame
无粘结部分预应力混凝土扁梁框架
1.
Recently, the unbonded partially prestressed concrete flat-beam frame structures are widely being used due to reducing the floor height and total height of building efficiently, cutting down the internal forces of structures caused by seismic effects, economizing the costs.
近年来,无粘结部分预应力混凝土扁梁框架结构由于可有效地降低层高和建筑总高,减小地震作用产生的结构内力,节省结构造价而得到了广泛的应用。
3)  prestressed frame beam
预应力框架梁
4)  frame beam of prestressed anchor
预应力锚索框架格梁
1.
Design study of frame beam of prestressed anchor to reinforce the debris slope landslide;
预应力锚索框架格梁在处治碎石土浅层滑坡中的应用
5)  prestressed concrete frame beam
预应力混凝土框架梁
1.
This article combines the design of long-distance multi-span prestressed concrete frame beams of a certain International Conference & Exhibition Center,emphasizing the loss of prestress and the influence of concrete beam prestressing force effect by lateral rigidity of vertical member,analyses and compares various kinds of stretching plans, decides design and construction method.
结合某国际会展中心超长多跨连续预应力混凝土框架梁的设计,着重就预应力损失以及竖向构件侧向刚度对混凝土梁预应力效应的影响,对各种张拉方案进行了分析比较,以确定设计和施工方案。
6)  frame foundation beam with prestressed anchor cable
预应力锚索框架型地梁
补充资料:安梁堡梁氏大宅

安梁堡梁氏大宅位于广东省高州市曹江镇安梁堡村。距离高州市中心约13公里,是典型的中西艺术交融,富有时代代表性的民国民居建筑。大宅是当地著名乡坤梁普埙、梁普篪兄弟的旧居,建成于1947年,占地面积达一万一千多平方米,建筑面积达四千多平方米。主体建筑分为东、西两宅,分别由前楼、后楼和侧楼组成,前楼一层,后楼三层,侧楼二层,前后楼之间有天井,并通过多条走廊相互贯通,连为一体。在功能分布上,后楼是主楼,是梁府家庭成员的生活起居住宅,前楼是雇工住宅和生活服务区,侧偻用于储存食物和物品。大宅还配套有花园、水井、池塘、厕所、猪舍、牛栏、码头等设施。大宅整体是中国传统的楼阁式,同时配合了西式的走廊和装饰。大宅的排水系统也别具一格,落到大宅的雨水通过管道进入天井中的大水池,水池水满后才往外排泄,因此,水池常年储满水,可备发生火灾时使用。大宅主体建筑对外的墙体上,每间隔一定的距离,就开有射击孔和瞭望窗,和大宅四周的围墙、护卫角楼组成了坚固的防御系统,从而使大宅成为一座集防卫、住宅、贮藏于一体等综合使用功能的建筑。

说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条