1)  vibro pile
管灌注桩
1.
There are some soft soil foundations on end of vibro pile in certain dwelling house region, and the some pile foundations on the bearing stratum are damaged due to shock and shear loads.
对某住宅小区沉管灌注桩桩端土中存在软弱透镜体,部分桩基发生持力层冲剪破坏事故进行分析,并对事故的处理及其工程设计及施工谈了几点体会,供设计人员参考。
2)  sinking pipe cast-in-place pile
沉管灌注桩
1.
The common quality problems in sinking pipe cast-in-place pile and the preventing steps;
管灌注桩常见质量问题及防治措施
3)  driven cast-in-place pile
沉管灌注桩
1.
Analysis and treatment for an accident of driven cast-in-place pile foundation;
某娱乐城沉管灌注桩工程事故分析与处理
2.
Vibratory driven cast-in-place pile technology;
浅谈振动沉管灌注桩施工工艺
3.
Base on two concrete engineering examples,the author came to the conclusion that a large number of piles broken in driven cast-in-place pile are due to the incorrect digging of foundation pit late.
通过2个工程实例分析了沉管灌注桩出现大面积断桩的原因是由于后期基坑开挖不当造成的,并提出了预防断桩出现的一些措施以及对断桩的处理补救措施。
4)  pipe sinking cast-in-place pile
沉管灌注桩
1.
Common quality defects of pipe sinking cast-in-place pile and control measures;
管灌注桩常见质量通病的分析与控制
2.
Based upon analysis of some questions encountered in construction of vibrator pipe sinking cast-in-place pile discussion is made from general situations of engineering, pile toe molding and other aspects.
对沉管灌注桩施工中的一些问题进行了分析 ,从工程概况、桩尖造型等方面进行了论述 ,提出了沉管灌注桩施工中应采取的措施 ,指出只有基础扎实 ,才能盖好高
5)  driven cast in place pile
沉管灌注桩
1.
In this paper, the reasons of appearing construction quality problems of driven cast in place pile had been analysed, and the specific measures for solveing these problems had been put forward, The new construction techniques of driven cast in place pile had been intraduced, Based on these, and now the new construction techniques of driven cast in place pile is better, Suggest to use the new one.
分析目前沉管灌注桩施工质量缺陷产生的原因 ,介绍了新的沉管灌注桩施工工艺 ,并与目前传统沉管灌注桩的施工工艺进行比较 ,得出新的沉管灌注桩的优点。
2.
The engineering geological conditions of Yandong Sewerage Treatment Plant in the Economic and Technical Development Zone of Ningbo City are described as well as the design of driven cast in place pile foundation.
文章在介绍了宁波经济技术开发区岩东污水处理厂工程地质概况、沉管灌注桩的设计描述及工程设计试桩有关资料后 ,根据该厂氧化沟 48根沉管灌注桩的现场高应变动测数据 ,按概率统计原理 ,对单桩极限承载力的分布进行了适度检验和区间估计 ,并计算出极限承载力的均值与标准差 ,还计算了桩的极限状态设计的可靠度指标β。
6)  driven cast-in-place piles
沉管灌注桩
1.
On the basis of the theory of analytical hierarchy process (AHP), models of project op-timization of dry jet mixing piles and driven cast-in-place piles were built ; meanwhile, it gave a de-tailed introduction to the application of the models based on a practical example.
运用层次分析法建立了喷粉桩与沉管灌注桩的比较优选模型,结合工程实例介绍了模型的具体运用。
2.
An engineering example of composite foundation with the driven cast-in-place piles, deep mixed-in-place piles and cushion is introduced.
一个由沉管灌注桩、深层搅拌桩、褥垫层组成的复合地基工程实例,指出褥垫层在复合地基中的重要作用和深圳地区沉降计算应注意的问题。
补充资料:灌注桩钻孔机
      利用取土或挤土装置在地层桩位上成孔,然后灌注混凝土成桩的桩工机械。适用于除流动淤泥层以外的一切土层成孔。
  
  钻孔机多以履带式挖掘机(或起重机)的底盘为底架,其上设置龙门导杆,作为钻凿工具的支承,并引导钻孔方向。挖掘机的发动机常作为钻孔机的动力装置。
  
  钻孔机按成孔方法,分螺旋式、冲抓式、潜水式和振动式四种,前三者属取土成孔,后一种属挤土成孔,还有综合上述多种方法的综合钻孔机。
  
  螺旋式钻孔机  用于民用和小型工业建筑,利用螺旋钻杆钻孔,螺杆通过上、下导架支承于桩架导杆上,其上端有驱动螺杆钻进的动力头,下端装带硬合金刀刃的钻头,作业时钻渣沿螺杆导槽自动排出,所钻桩孔孔壁规则,不需护壁或清洗孔底,钻至设计深度后,提出钻杆,即可灌注混凝土。此外,还有短螺旋钻孔机和有双刀管、双螺旋及底部扩孔刀的冻土钻孔机。前者专用于爆扩成孔及孔底成形;后者适用于严寒冻土,并能将孔底扩大,增加桩的承载力。
  
  冲抓式钻孔机  用于大型工业建筑和桥梁施工,可在土石混合地层、卵石或岩石地层上成孔。利用钻具冲击岩石,使之破碎,然后抓石出渣,达到成孔目的。由机架、卷扬机和钻抓工具组成。钻抓工具有螺旋钻、抓锥和冲锥三种,可根据土质拆换使用。在地下水位较高的泥质地区,采用螺旋钻,钻渣用压力水冲成泥浆排出。抓锥形如抓铲,单索操纵,可抓掘石块和卵石。冲锥有一定重量,下端有刀刃,用于冲凿岩石及坚土。
  
  潜水式钻孔机  用于沿海软土地区的桩基础施工,由潜水电动机、行星齿轮减速器和笼式钻头等组成。电动机通过减速器驱动5~7个钻头切削土壤,同时将压力水沿水管从钻头尖部射出,使钻渣成泥浆排出。设备较简单,无公害,效率高,可在各种土质条件下作业。
  
  振动式钻孔机  适于在砂土和软土地层成孔。用振动沉拔桩机将底部有单向活门的桩管沉入土中,达设计深度后,边借振动力将桩管逐渐拔出,边通过活门灌注混凝土。也可利用落锤或汽锤将桩管打入土中成孔,利用拔桩机拔出桩管,然后灌注混凝土成桩,但效率低。
  