1) span-by-span construction
逐孔施工
1.
The system, in the span-by-span construction of bridge, will experience three kinds of shifts from the state of simple beam to the continuous state,from overhanging beam to the continuous beam and from few-spans continuous beam to required degree span by span.
在桥梁工程逐孔施工过程中 ,体系将发生由简支梁状态到连续梁状态 ,由悬臂梁到连续梁 ,由少跨连续梁逐孔延伸到所要求的体系三种转换 ,同时结构计算图式和内力也发生变化。
2) span fby span construction method
桥梁逐孔施工法
3) moving model shelf cost construction
移模逐孔浇筑施工
4) floor-by-floor erection
逐层施工
5) Span by span construction method
逐跨施工法
6) Bit by bit construction method
逐段施工法
补充资料:动力头钻机施工边坡加固孔
动力头钻机施工边坡加固孔
1262
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条