1) Generator electrical test
机组电气试验
2) electrical back-to-back test
背对背电气试验,对组电气试验
3) test unit
试验机组
4) electric test
电气试验
1.
This paper introduced the process of a hydrogen explode at 600 MW generator,analyzed the explode cause from the aspects of hydrogen displacement and electric test,then some suggestions and measures are proposed for gas displacement in generator and electric test.
介绍了一起600 MW发电机发生氢爆事件的经过,从氢置换和电气试验方面进行原因分析,提出了针对发电机气体置换和试验的建议和措施。
2.
The paper discusses present methods of electric tests for generators in China, a new multifunctional supervision test system for parameter measurement of generators, electric start-up test and failure records is introduced, and the advantage, practicality and special characteristics of the system are presented.
讨论了我国现有的发电机电气试验方法与试验手段,介绍了一种新型的、集发电机参数监测、电气总启动试验和故障记录为一体的综合监测试验系统,并指出其先进性、实用性和独有的特
5) electrical test
电气试验
1.
This paper introduces how NGK Tangshan Electroceramics Company Limited to realize the control of the varying speed regulation of the electric engine in the electrical tests by using the frequency- transformer,and probes into the advantages of the speed- control by frequency- transformer comparing with the speed- control by electric engine under the traditional mode.
介绍了NGK唐山电瓷有限公司如何利用变频器实现对电气试验中电机变速调节的控制,探讨了与传统方式下电机速度调节相比变频器速度调节的优点。
2.
The construction technology for the in-situ insertion of generator stator winding rods and the results of the electrical tests of generator stator are presen.
叙述了江垭水电站发电机定子现场下线的施工工艺 ,介绍了定子电气试验的结果 ,并对如何控制发电机电晕电压采取的施工措施提出了看法。
3.
The maintenance and testing methods for such main equipment as the transformer and the GIS of underground substations are presented,including the electrical testing scheme and equipment maintenance strategies.
介绍地下变电站中电力变压器、GIS等主要设备的检修和试验方法,论述新型电气设备、电气试验方案与设备检修策略。
6) Electrical Testing
电气试验
1.
The Substation Electrical Testing Coach(EST-C1) is used for high voltage electrical equipment in substation or feeder station s preventive test and project s handing over test.
EST -C1变电站电气试验车适用于电力变电站及电气化铁路牵引变电所的电力设备的工程交接试验及预防性试验。
补充资料:水轮发电机组带负荷试验
水轮发电机组带负荷试验
onload test of water turbine-generator set
shu一tun一fod旧n]lzu dol fuhe shlyon水轮发电机组带负荷试验water turbine一generator set)(onload test of水轮发电机组起动试运行中带负荷时机械和电气的试验工作。带负荷试验的目的是检验机组及其辅助设备在各种负荷工况下的运行情况,为机组投产发电做好准备。主要试验内容有主变压器升压及冲击合闸试验、甩负荷试验、低油压关闭导叶试验、发电机作调相运行试验、机组带负荷下调速系统和励磁装!的试验等。 主变压器升压及冲击合闸试脸一般水枪发电机都通过主变压器升压后与电力系统连接。主变压器第一次利用发电机升压可从零升起,在额定电压的25写、50%、75%、10。%下检查发电机电压设备和主变压器的情况,检查有无不正常的声音及异常现象。主变压器升压后情况正常,即可进行冲击合闸试验。冲击合闸试验的目的主要是检查差动保护装t是否能躲过冲击时的励磁涌流。冲击合闸最好在主变压器高压侧利用系统电压进行。此时主变压器低压侧与发电机断开。冲击合闸一般在额定电压下进行5次。 甩负荷试验甩负荷试验的目的是检查当机组甩负荷时,水轮机调速器和励磁调节器(见水轮发电机励滋)的动态特性和检验蜗壳压力上升率与转速上升率是否符合设计要求.甩负荷试验一般甩有功负荷。当机组带负荷运转突然甩掉负荷时,通过水枪机的水量保持不变,因而水轮机得到了过剩的力矩,此力矩使机组加速。机组转速升高后,调速器即迅速关闭导叶,减少进水盆,机组转速下降。导叶关闭时间愈短,机组转速上升愈小,蜗壳和压力管道中的压力上升愈大。因此,必须选择适当的导叶关闭时间,使蜗壳和压力管道的压力上升率和机组的转速上升率都不超过设计允许值。甩负荷试验分4个阶段进行,即分别按额定有功功率的25%、50%、75%、100%甩4次。对于并人电网的机组,甩负荷的方法是机组带上预定的负荷,跳开发电机断路器或主变压器高压侧断路器,突然将负荷甩掉,此时要记录机组的负荷、转速、蜗壳压力、顶盖及尾水管真空压力、导叶开度、接力器行程、各轴承温度、机组各部位的摆度和振动以及上下游水位等.不仅要记录甩负荷前后的数据,还要记录在甩负荷过程中出现的最大值。然后计算出蜗壳压力上升率、机组转速上升率和调速器的残留不平衡度.对于电力系统容量较小,甩系统负荷有困难的机组.往往采用水电阻器作负荷进行甩负荷试验。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。