1) project of network
方案布设
3) facilities layout alternatives
设施布局方案
1.
Based on the utility analysis in the economics,by searching the key path between a traffic mode and another transfer mode in the intermodal transfer points,a utility cost model is put forward to evaluate and optimize the facilities layout alternatives of the urban intermodal passenger transfer points.
利用经济学中效用分析法,通过寻找枢纽内存在换乘的任何2种交通方式之间的关键路径,建立枢纽内设施不同布局方案的效用损失模型,以此评价和优化枢纽内设施布局方案。
4) layout/conceptual design
布局/方案设计
5) station layout program
车站布设方案
6) logistics facilities system plan
物流设施布局方案
1.
In order to guarantee the validity of the logistics facilities system plan,the plan evaluation as a important premise is ought to do.
3PLS物流设施布局直接关系到企业的战略和运作两个层面,对若干初始方案进行评价是保证物流设施布局方案有效性的前提。
补充资料:布设
1.布置。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条