说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 词典 -> 管理博弈过程
1)  management game process
管理博弈过程
1.
This article analyzes the management game process between large and small shareholders in company controlling structure by quantitative and qualitative analysis.
用定量和定性相结合的方法分析了公司治理结构中大小股东行为的管理博弈过程
2)  game process
博弈过程
1.
This paper analyzes the bargainning behavior and game process of institutional main forces and common members in the stock market, on the basis of which, the cost function decribing the game process of the institutional main forces and common members is constructed.
分析了机构主力与散户在股市的交易行为和博弈过程 。
3)  management game
管理博弈
1.
Author puts forward the mechanism expression method of management game according to the character that an incentive and restraining mechanism of management has many factors,goals and phases.
根据管理激励与约束机制具有多因素、多目标、多阶段特征 ,本文作者提出了管理博弈机制式表述方法。
4)  managerial game theory
管理博弈论
5)  process modeling of computer game
机器博弈过程建模
6)  Supervisory game
监管博弈
补充资料:安装过程质量管理


安装过程质量管理
quality management of installing process

  的监督检查;0实行安装过程质量记录的规范化管理。 (李跃生)anzhuang gu。沙恰ng zhiljang guanli安装过程质皿管理(卿目ity 11旧n叫笋Inent ofin-stallingp找犯ess)在设备(产品)安装的准备、实施、试验和试运转全过程中对人员、设备、环境、方法等影响安装质量的各因素所实行的各项质量管理活动。安装质量水平直接影响被安装设备(产品)的性能和寿命,甚至影响人身安全。安装过程质量管理的要点如下: ①正确处理安装质量、安装进度、安装费用的关系,在安装全过程贯彻“质量第一”的方针; ②贯彻执行国家和行业有关安装的技术标准和管理标准; ③编制安装计划、安装作业指导书等全套安装程序文件; ④对安装单位,包括工程总承包单位和分部、分项工程分承包单位的资格审查; ⑤对安装人员的上岗培训和资格审查; ⑥明确落实安装单位和安装人员的质量责任,实施质童否决权; ⑦对安装合同进行合同评审; ⑧按规定进行安装工程技术交底; ⑨对安装设备(工具)进行使用前检查、校准和使用中的维护,并对供水、供电、供气等安装配套设施进行检查和维护; ⑩对被安装设备(产品)的现场保管、搬运、吊装和验收前保护等环节实行质量控制; ⑧按规定进行安装地基、位置的确定、测量及检验; ⑩安装环境控制,尤其是对安装现场有环境要求时,如对温度、湿度、防尘、防震、防潮等的要求; O明确安装与土建工程之间、各安装分部或分项之间的技术接口和管理接口; 。对安装图纸实行技术状态管理; 0严格执行安装程序,尤其要严格控制安装过程中焊接、起吊、电气部分安装等特殊工艺的质量控制; ⑩严格隐蔽工程的过程质量控制,并将其与质量检验同步进行; ⑩加强安装全过程的质量检验,包括自检、互检和专检,进行必要的安装试验和试运转,并接受质量监理
  
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条