1) garbage extruding pile impacted and rammed by a heavy hammer
重锤冲孔夯扩垃圾挤密桩
1.
By the construction example of garbage extruding pile impacted and rammed by a heavy hammer, the method is analyzed and some suggestions are put forward.
本文通过重锤冲孔夯扩垃圾挤密桩处理软弱地基工程实例介绍 ,对此方法进行了分析 ,并提出了改进意见。
2) DRE pile
钻孔夯扩挤密桩
1.
The composite foundation formed by CFG pile and drilling ram expanded pile (DRE pile) which used widely in Beijing area are applied to a project, using CFG pile to minimize the building settlement and DRE pile to improve shallow soil bearing capacity respectively.
介绍了北京地区应用广泛的 2种刚性桩CFG桩和钻孔夯扩挤密桩相结合形成的二元桩复合地基在锦秀馨园工程中的应用 ,其中利用CFG桩控制建筑物沉降 ,利用钻孔夯扩挤密土桩提高浅层土的承载力 ,通过计算得出了最佳设计方案 ,静载荷试验和沉降观测结果表明本工程设计是合理
3) column hammer compact-expanded stone pile
加柱锤夯扩挤密碎石桩
4) enlarged compaction pile by tamping
夯扩挤密桩
1.
According the project practice, the method of adopting the local natural grit as the meterials of the enlarged compaction pile by tamping is put forward, the process and the main construction points of the method is introduced, the quality requirements is emphasized.
结合实际工程,提出了采用当地天然砂砾为材料的夯扩挤密桩处理地基的方法,并介绍了该方法的流程及施工要点,强调了质量要求。
5) Down Drilled Hole Dynamic Compaction composite pile
钻孔夯扩挤密复合桩
1.
according to the successful application of Down Drilled Hole Dynamic Compaction composite pile on high-rise buildng foundation,the method of design and construction of this kind of composite foundation are expatiated.
通过钻孔夯扩挤密复合桩地基处理在高层建筑物的成功应用 ,阐述了的钻孔夯扩挤密复合桩地基设计和施工方法 ,结合工程实践 ,阐明了该地基处理工法的特点。
6) tamping and expansion gangue pile
夯扩挤密矸石桩
1.
Equal energy,equal deformation tamping and expansion gangue pile is a new strengthening method,which not only has the effect of tamping and expansion,but also strengthens complex earth-fill.
等能量、等变形夯扩挤密矸石桩是一种地基加固新技术。