1) regulation and guarantee calculation
调保计算
1.
Starting from analysis of hydraulic power transient process, and combining with available research results, this paper comprehensively studied the choice of GD2 , based on the fact that Shuibuya water power plant has large installation capacity and long water pass tube, and the regulation and guarantee calculation parameters are under critical s.
本文针对水布垭电站装机容量大和输水管道长且调保计算参数处于临界状态等特点 ,从水力过渡过程和电力系统分析入手 ,结合已有的科研成果 ,较全面地对水布垭电站水轮发电机组飞轮力矩GD2 的选取进行了分析 ,对类似水电站的设计具有一定的借鉴意义。
2) calculation of regulation guarantee
调节保证计算
1.
By calculation of chamber surge,regulation guarantee,and regulation system stability,the type and size of surge chamber were determined preliminarily,and main parameter setting value of governor was recommended,and results of calculation of regulation guarantee was presented.
通过对下坂地水电站的调压室涌波计算、调节保证计算以及调节系统的稳定分析,确定调压室的型式和尺寸、推荐调速器主要参数整定值、提出了调节保证计算成果,并得出结论电站即使孤立运行也能满足小波动稳定性要求,为电站及引水系统的设计提供了依据。
4) protection calculation
保护计算
5) break-even computation
保本计算
6) conservative computation
保守计算
1.
Additionally,the strategy of conservative computation could make sure the correctness of the mining results.
挖掘数据流上最近的频繁模式算法使用模式树RFP-tree增量维护数据流上最近的频繁模式,且仅需单次扫描流数据;另外,保守计算策略保证模式挖掘的正确性。
补充资料:洪水调节计算(见水库调洪计算)
洪水调节计算(见水库调洪计算)
hongshui tiaojie洪水调节计算J ISUan 见水库调洪计算。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条