1) on-off energy loss
开停机损失
2) Downtime Losses
停机损失
3) breakdown loss
故障损失,事故停机损失
4) breakdown loss
故障(停机)损失
5) unit start-stop loss
机组启停损失
6) outage cost
停电损失
1.
Research on customer outage cost assessment and its evaluation method in urban electric power network;
城市电网用户停电损失估算及评价方法研究
2.
Research on estimation methods of power outage cost in rural power network;
农村电网停电损失估算方法研究
3.
On the one hand, the customers hope for higher reliability with less money to reduce their outage costs; on the other hand, it is difficult for the supply department to enhance the power supply s reliability because of the limit of money and technology.
一方面用户希望在经济的前提下得到可靠度高的供电,以降低其停电损失;而另一方面,供电部门在提高供电可靠性上受着资金和技术的限制。
补充资料:采用强夯法进行机场停机坪软土地基加固
采用强夯法进行机场停机坪软土地基加固
采用强夯法进行机场停机坪软土地基加固 I
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条