3) presetting-height
预抛高
1.
Analyze the occasions and principles of treating the bump at bridgeheads with presetting-height.
分析了预抛高法处理桥头跳车实施的时机和原则,提出了一种确定插塑板超载预压处理路段预抛高值的计算方法——考虑有效应力面积比的分层总和法,并介绍了该法在计算时应注意的问题及其不足之处,根据该法的计算结果,验证了其准确性。
4) height formula
抛高公式
1.
Combined with practical engineering,this paper discusses controlling factor and treatment method of deflection in the process of cantilever construction of large-span PC continuous rigid frame bridge,and carries out proper amendment of theoretical height formula,which to offer a reference for relevant problems.
结合工程实例,对大跨度PC连续刚构桥在悬臂浇筑过程中的挠度控制因素及处理方法进行了探讨,并对理论抛高公式做出适当的修正,供相关问题参考借鉴。
5) height with allowance
预抛高
1.
New method of the height with allowance of the bridge-head roadbed of the high-grade highway;
某高等级公路桥头路基预抛高新方法
2.
As for the expressway roadbed height with allowance, one calculation method is put forward, and the problems existing in this method are analyzed and summarized.
针对高速公路路床预抛高设计提出一种计算方法,并对该法中存在的问题进行分析、研究、总结,有利于其推广应用。
6) high dropping
高位抛落
1.
Some important issues are discussed for the manufacture,such as welding and installation of the concrete filled steel tubular column,laying of concrete,adjustment of slump,high dropping of concrete,pouring and vibration of concrete and quality check method of concrete filled steel tubular column.
介绍高层建筑钢管砼柱的关键施工技术和质量控制方法 ,包括钢管柱的制作、组焊、安装、混凝土浇筑、坍落度调整、高位抛落并振捣的方法及钢管砼柱的质量检查方法
补充资料:冲击高电压测量(见高电压测量)
冲击高电压测量(见高电压测量)
measurement of high impulse voltages
ch。门引才g。。dion丫日cel}o口g冲击高电压测量(rneasurement ofhighimpulsevoltages)见高电压测量。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。