1)  hoisting method
吊装法
1.
A new installation method for steel approach bridge of the floating pier on the Changjiang River--jacking method is introduced and technological analysis and economic comparison are conducted with comparison to hoisting method.
介绍长江中浮式码头钢引桥安装的新方法—顶升法 ,并对其与吊装法进行了技术分析和经济比较。
2)  integral lifting method
整体吊装法
1.
Combined with practical works two installation method of space truss: altitude spread roof-member method and integral lifting method are introduced in detail,which provide good references for similar works.
介绍了网架结构的特点及其广泛的应用范围,结合具体工程实例,对空中散装法和整体吊装法两种网架安装的施工技术进行了详细阐述,为类似工程提供了参考。
3)  mast elevating
桅杆吊装法
4)  preassembled method
预制吊装法
5)  cable-hoisting erection method
缆索吊装法
1.
At present, the main construction methods of long span (RC) arch bridge in China are arch centering method,cable-hoisting erection method,recast segmental cantilever method, swing method and Melan method.
目前,我国大跨度钢筋混凝土拱桥采用的施工方法主要有体外支架法、缆索吊装法、悬臂拼装法、转体法和劲性骨架法。
6)  erection with vertical rotation method
竖向转体吊装法
补充资料:厂房钢结构组合吊装


厂房钢结构组合吊装
combined hoisting of steel structure for workshop building

  采用组合吊装时,要结合结构型式,根据起重设备能力,保证安全、质量,提高作业效率的原则确定构件组合的范围。常用的组合形式有:(l)多节柱的组合,对H形框架结构也可采用柱与梁组合;(2)吊车梁与辅助析架的组合,将吊车梁、辅助析架利用制动板、水平支撑、垂直支撑进行固定,形成组合体;(3)天窗架的组合,将垂直天窗架与屋面、墙面擦条、天沟和支撑等进行组合;(4)墙面系统的组合,以墙皮柱作骨架,将其与墙面镶条、拉条和钢窗等组合在一起.(5)厂房屋面系统整体组合吊装,将2~3棍屋架,与屋架间上下弦的水平支撑、垂直支撑、屋面镶梁、天沟及天窗等全部构件组合成整体进行吊装。 组合吊装一般选用大型塔式起重机或履带式起重机。吊装前要对起重设备和组合构件进行验算,包括:(1)起重机的起重能力(包括起重量、回转半径、起重高度等)复核;(2)组合件整体稳定和局部稳定验算;(3)吊点处局部变形验算和吊点距离计算;(4)提升用绳索和吊具验算。验算结果全部符合技术要求后,方可进行吊装。 (刘庆华)ehangfang gang」旧gou zuhe dlaozhuang厂房钢结构组合吊装(eombined hoisting ofsteel strueture for workshop building)将部分单体构件预先在地面上组拼成整体后,用起重设备提升到设计位置上的作业。这种方法比单体吊装可大量减少高空作业,节省大型起重设备的台班费用,有利于保证结构节点的焊接质量。但施工准备时间较长,结构组合几何精度控制较复杂,并需选用有较大提升能力的起重设备。
  
说明:补充资料仅用于学习参考,请勿用于其它任何用途。