1) rock anchored wall
岩石锚固墙
1.
As a result of reinforcement of numbers of cables,the continuous compressive zone namely,rock anchored wall is formed under the combinative action of prestressed anchorage cables and system anchor bolts.
对于三峡船闸高边坡,在预应力锚索和系统锚杆的共同作用下形成表层压缩带,构成了所谓的岩石锚固墙,进而缓解岩体力学性状随开挖爆破的劣化过程,限制边坡岩体的变形,改善了边坡的稳定性。
2) fully bounded rock bolt
全长锚固型岩石锚杆
1.
Relation between the size of plastic zone and the location of the peak value of axial force distribution in fully bounded rock bolt has been analyzed with in situ measurements and a computer simulation.
通过现场试验和数值模拟,分析了全长锚固型岩石锚杆轴力分布形态和软弱岩体中隧道塑性区大小之间的关系,结果表明除了围岩中存在明显的不连续面之外,二者之间没有明确关系。
3) anchored rock wall
岩锚墙
1.
Anchor cable constructing for spillway anchored rock wall in Yinzidu hydropower station;
引子渡水电站溢洪道岩锚墙锚索施工
4) anchorage wall
锚固墙
5) rock slope anchorage mechanism
岩石边坡锚固机理
6) rock and soil anchoring
土、岩锚固
补充资料:锚固
锚固
anchor
mO0gU锚固(a nchor)采用锚杆或锚索对边坡进行加固的作业。在边坡上钻孔穿过潜在滑面,插人锚杆或锚索,在锚固端注浆后对锚杆(索)预加拉应力,最后在坡面上锁紧锚头。其作用原理是借助锚固段砂浆与孔壁周围岩体的摩擦阻力,将锚杆(索)的应力传递到潜在滑动面以下的深部岩体中,增高滑体对滑面上的正应力,从而提高抗滑阻力,使锚杆(索)锚固端两端部之间形成压力锥体范围内的岩石被挤压,进而使潜在滑动面上下的岩石与锚杆(索)联成一个整体,形成一均匀挤压带,约束了岩体的变形和破坏,提高了坡体的稳定性。其作用原理见图l。 对于平面型滑坡锚杆(索)加固作用(图2)以公式表达: 加固前K,一昼塑竺决李型兰卫二 。。二n:‘”Gsin口 二.二。。_[Geosa+Psin(a+6)〕tan笋+CL 加固后K:二匕=共一舟井拱子拼井罕拱裂止二 ““目,“一’‘Gsinq一尸cos(口十6)式中分子表示抗滑力;分母表示滑动力;Kl、K:分别为加固前后边坡稳定性系数;G为滑坡体重量四为滑动面倾角;0为预应力锚杆(索)与水平面的夹角;尹为岩石的内摩擦角;C为岩石粘结力;L为条块滑面长度;尸为锚杆〔索)每沿米的预拉力。 预应力锚杆(索)主要适用于岩体整体性较好且具有确定的潜在滑动面的岩质边坡。笋 图1锚杆(索)作用原理示意图 王一压缩带;2一猫杆(索);3一未加固的表面岩石; 4一锚头;5一滑动面;6一锚固段 、尸少汀 G 图2锚固力尸的作用图
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条