1) Zhelin Hydropower Station
柘林水电站
1.
Reasonability and characteristics of safety monitoring system for Zhelin Hydropower Station were discussed.
讨论了柘林水电站安全监测网布置的合理性和特点;分析了安全监测成果;并采用能反映边坡变形行为特点的模型,对重要监测点的监测数据进行了变形预测。
2) Zhexi Hydropower Station
柘溪水电站
1.
Slope Deformation Analysis of Switch Station of Zhexi Hydropower Station;
柘溪水电站开关站边坡变形分析
3) Zhexi Power Stat
柘溪电站
4) Zhelin reservoir
柘林水库
1.
Evaluation on ecological service function and value of Zhelin reservoir;
柘林水库的生态服务功能与价值评估
2.
Influence of hydrologic factor on flood control risk rate in Zhelin Reservoir;
水文因子对柘林水库防洪风险率影响分析
5) Zhelin Basin
柘林水库流域
1.
Study on Retrieval of Precipitation from RS Data in Zhelin Basin
柘林水库流域降水遥感反演研究
6) Silin hydropower station
思林水电站
1.
Seepage analysis of the non-overflow section at Silin hydropower station;
思林水电站非溢流坝段渗流分析
2.
Analysis on hydraulic transient of long trailrace tunnel without tailrace surge tank for Silin Hydropower Station;
思林水电站长尾水隧洞取消尾调水力过渡过程分析
3.
Stability analysis and safety evaluation for high rock slope of navigable lock of the Silin Hydropower Station;
思林水电站船闸高边坡稳定安全分析与评价
补充资料:蒂斯林水电站
蒂斯林水电站 |
Tishrin Hydropower Station |
概 述 |
蒂斯林水电站位于叙利亚、幼发拉底(Euphrates)河上,是目前叙利亚在建的最大工程。工程用于发电。土石坝最大坝高36m,水库库容0.019亿m3,径流式电站装机容量63万kW,年均发电量13.1亿kW·h,工程于1994年已开工,1997年9月截流,拟1999年3月开始第一台机组发电。 |