1) expected characteristic
![点击朗读](/dictall/images/read.gif)
期望特性
1.
A new sliding mode controller (SMC) based on expected characteristics is proposed.
![点击朗读](/dictall/images/read.gif)
研究了一种基于期望特性的滑模控制器 。
2) desired performance
![点击朗读](/dictall/images/read.gif)
期望性能
1.
Results show that for more than 94% of all cases measured,CPIT can control the execution and consequently achieve the desired performance for a given thread.
结果表明,对于模拟的所有负载,CPIT在94%以上的情况下都能保证受控线程获得期望性能。
3) anticipant character
![点击朗读](/dictall/images/read.gif)
期望性状
4) larger the better
![点击朗读](/dictall/images/read.gif)
望大特性
1.
Taguchi s signal-to-noise ratio for the cases of "larger the better" quality characteristics is generally derived from the reciprocal of its quality characteristics value so that the signalto-noise ratio for the cases of "smaller the better" quality characteristics can be calculated.
田口方法中望大特性信噪比是在望小特性的基础上,对质量特性值取倒数得到的。
5) Definite purpose
![点击朗读](/dictall/images/read.gif)
望目特性
6) smaller-the-better characteristic
![点击朗读](/dictall/images/read.gif)
望小特性
1.
The rules in percentile formulation for fuzzy robust design are proposed when the product quality possesses a larger-the-better or smaller-the-better characteristic.
提出了模糊健壮设计中望大特性和望小特性的分位数型设计准则,并根据模糊健壮设计原理,建立了望大特性与望小特性的模糊健壮设计优化模型。
补充资料:电能不足期望值
表示电力系统由于机组受迫停运而造成的对用户少供电能的期望值,这一指标能说明故障的严重程度,因为电力系统受限制的因素不仅仅是缺电力,更重要的是发电量的短缺。
计算EENS指标时,一般必须先制订发电机组的停运容量概率表和小时负荷曲线。对某一已知停运容量状态,则每小时不足电量等于不足电力乘以此状态的概率,即EENS=(X-R)×P(X)式中X为停运容量,R为系统备用容量,P(X)为停运容量为X的确切概率。
一年中EENS值可由下式计算:式中P(X)为第i时间段第j天第 k小时停运容量大于等于X的概率,Ci为第i时间段的系统装机容量,L为第i时间段第j天第K小时的负荷,m为一年中时间段,ni为第i时间段中的天数,K为一天中的第K小时。
电能不足期望值综合表达了停电次数、平均持续时间和平均停电功率。
计算EENS指标时,一般必须先制订发电机组的停运容量概率表和小时负荷曲线。对某一已知停运容量状态,则每小时不足电量等于不足电力乘以此状态的概率,即EENS=(X-R)×P(X)式中X为停运容量,R为系统备用容量,P(X)为停运容量为X的确切概率。
一年中EENS值可由下式计算:式中P(X)为第i时间段第j天第 k小时停运容量大于等于X的概率,Ci为第i时间段的系统装机容量,L为第i时间段第j天第K小时的负荷,m为一年中时间段,ni为第i时间段中的天数,K为一天中的第K小时。
电能不足期望值综合表达了停电次数、平均持续时间和平均停电功率。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条