1) dam rolled on whole section
全断面碾压混凝土坝
2) full face RCC
全断面碾压混凝土
1.
The micro-slump concrete is used in the design and construction of full face RCC double curvature arch dam of Xuanmiaoguan reservoir.
玄庙观水库复建工程全断面碾压混凝土双曲拱坝设计和施工,采用了微坍落度混凝土、溢流坝边墩设置宽尾墩、横缝和诱导缝安装预制模板快速成缝、上下游面组装可调节大模板等新技术,该项目设计和施工的新实践,为碾压混凝土坝建设提供了新经验。
3) bedrock surface of BCC dam
碾压混凝土大坝建基面
4) RCC arch dam
碾压混凝土拱坝
1.
Simulation analysis of stress field of Sanglang RCC arch dam and its construction joints;
桑郎碾压混凝土拱坝应力场仿真计算及分缝设置
2.
Study on joints allocation of RCC arch dam on Yunlong River;
云龙河碾压混凝土拱坝结构分缝研究
3.
Simulation analysis for temperature field of Sanglang RCC arch dam;
桑郎碾压混凝土拱坝温度场仿真分析
5) RCC dam
碾压混凝土坝
1.
Analytical method of viscoelastic calculation parameters of effect zones of RCC dam;
碾压混凝土坝层面影响带粘弹性参数的确定
2.
Back analysis of thermal expansion coefficients of RCC dam;
碾压混凝土坝温度线膨胀系数反演分析
3.
Fuzzy comprehensive evaluation on construction planning of RCC dam;
碾压混凝土坝施工方案模糊综合评判
6) roller compacted concrete dam
碾压混凝土坝
1.
Procedure of element growing and mesh moving for simulation of 3-D temperature field of roller compacted concrete dams;
基于生长单元网格浮动的碾压混凝土坝温度场分析
2.
Reliability analysis of roller compacted concrete dam;
碾压混凝土坝可靠性分析
3.
Construction plan of roller compacted concrete dam based on entropy weight multi-objective decision
基于熵权的碾压混凝土坝施工方案多目标决策
补充资料:福建省第二座碾压混凝土坝——龙门滩一级水库
福建省第二座碾压混凝土坝——龙门滩一级水库
目 福建省第二座碾压混凝土坝— 龙门滩一级水库
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条