1) Xiehuiken reservoir
下会坑水库
1.
Based on comparing several form plans of the weir surface concrete construction of the spillway weir on Xiehuiken reservoir,the construction scheme of overseting the small form by the relevent sequence which is that the common moulding is combined with the sliding formwork was adopted.
通过对溢流堰堰面砼施工中几种模板方案的综合考虑,下会坑水库采用了滑模与常规立模相结合的小模板依次上翻的施工方案,较好地完成了堰面施工任务,既节省了材料,又加快了施工进度,而且保证了堰面的施工质量。
2) Xikeng Reservoir
茜坑水库
1.
Application of optical-fibre sensors to seepage monitoring of earth dam of Xikeng Reservoir;
光纤传感器在茜坑水库土坝渗流监测中的应用
2.
Research on BMPs of non-point sources pollution in Xikeng Reservoir Watershed;
茜坑水库流域面源污染最佳管理措施研究
3.
Nitrogen and phosphorus,coming mainly from non-point sources(NPS),are major nutrients to cause eutrophication to degrade water quality of Xikeng reservoir,one of the important drinking water sources in Shenzhen.
茜坑水库是深圳市重要的饮水源水库,非点源污染防治任务严重。
3) Baishuikeng Reserroir
白水坑水库
4) Songzikeng Reservoir
松子坑水库
1.
Study of the Ecological Slope along the Water Fluctuation Belt in Songzikeng Reservoir in Shenzhen;
深圳市松子坑水库消涨带生态护坡研究
5) Huanglongken reservoir
黄龙坑水库
6) Baitukeng Reservoir
白土坑水库
1.
Application of geosynthetic material in dam anti-seepage and diversion treatment of Baitukeng reservoir
土工合成材料在白土坑水库大坝防渗与导渗中的应用
2.
In strengthening of Baitukeng Reservoir,the dam slope was paved with composite geomembrane,while the dam foundation was paved with plastic film in v.
在白土坑水库加固中,坝坡铺设复合土工膜,坝基进行垂直铺塑并将两者连为一体。
补充资料:坑坑坎坎
1.坑坑洼洼,凹凸不平。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条