1) network splitting
解环运行
2) loop-net operation
环网运行
1.
Insufficient consequence at 6kV double supplies circuit loop-net operation is analysed and calculated according to the present status of mine supply system.
根据煤矿供电系统的现状,分析计算当6kV双电源回路环网运行时可能出现的不良后果。
5) running environment
运行环境
1.
Design of running environment for FEM software package;
微机有限元软件包FEM的运行环境设计
2.
The tunnel traffic security system of expressway is a complicated dynamic system,which is to the optimization of the traffic safety running environment of the tunnel,in order to reduce the possibility of the traffic accident and lighten the severity of it,to improve the service level of the road,and to guarantee the safety of the tunnel.
高速公路隧道交通安全保障系统是一个复杂的动态系统,是对隧道交通安全运行环境的优化,以减少交通事故发生的可能性以及减轻事故的严重程度,提高道路服务水平,保证高速公路隧道的安全行车。
3.
This article analyzes the cause of the software fault,fully discusses the software running environment and raises the method of troubleshooting software fault.
分析了软件故障产生的原因,对软件运行环境做了全面的讨论,并提出软件故障的分析方法。
6) run-time environment
运行环境
1.
Design of open content object and its run-time environment based on SCORM specification;
基于SCORM的开放式内容对象及其运行环境的设计
补充资料:合环与解环
合环与解环
loop closing and opening
hehuon yu Jlehuon合环与解环(loop elosing and opening)在并列运行的电力系统中,将发电厂或变电所间的输电线路连接成环状网络或将环状网络解开。合环运行能提高电力系统运行的灵活性、经济性、可靠性。可以利用先合环后解环的办法将发电厂或变电所在不解列和不停电的情况下由一个电力网切换到另一个电力网。解环运行常是为了减小电力系统短路容量和满足系统运行方式的要求。 合环若合环点两侧有相位差和电压差,合环后会出现环流,可能引起环路内的电力设备过负荷或使继电保护装置动作而跳闸。在电力系统实际运行中,电压差允许在10%以内(500 kV电网应在5环已内),相位差在5o以内合环即可,但由于系统结构不同,有的系统合环相位差允许100~150。在合环前,对合环环流一般都要进行计算,做模拟或实时工况合环试验,根据计算和试验结果确定合环时允许的相位差和电压差。进行合环操作时,若相位差和电压差不符合允许条件,则必须调整到允许范围内。 解环解环时要尽量减小解环点的有功功率和无功功率,以免解开环网时功率和电压的变化太大,引起电力系统发生异常或故障。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条