说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 词典 -> 现场管理费索赔
1)  compensation-claiming in supervision cost
现场管理费索赔
2)  field overhead
现场管理费
3)  claim management
索赔管理
1.
Combining with the engineering examples, this paper introduces several key points of claim management in the construction of highway project from aspect of strengthening the claim consciousness, improving the quality of contract managers, seeking the claim opportunities, and mastering the claim negotiation skills, etc.
结合工程实例,从强化索赔意识、提高合同管理人员素质、寻求索赔机会、掌握索赔谈判技巧等方面介绍了公路工程施工中的索赔管理几个要点。
2.
s: During the process of project management in international project, claim management is very important.
在国际工程的项目管理工作中,索赔管理是承包商保护利益的行为和减少损失的必要手段,也是承包商综合管理能力的具体体现。
3.
The essential problem existed in building construction claim management is found out.
从索赔的基本概念入手,论述了建筑工程施工索赔管理存在的问题,并就此提出几点建议。
4)  claims management
索赔管理
1.
Claims Management of Engineers Based on the Whole-process of a Construction Project;
监理工程师基于工程项目全过程的索赔管理
2.
Reseach of Engineering Claims Management Based on Risk Analysis;
基于风险分析的工程索赔管理研究
3.
Some problems, which include claims opportunity, claims operation and claims management etc, in construction claims are discussed in this paper.
对施工索赔中的索赔机会、索赔操作和索赔管理等问题进行了探讨。
5)  cost claim
费用索赔
1.
By means of cost claim,the contractors can protect their legal rights and interests and can claim their losses.
费用索赔是整个合同索赔的重点和最终目标,是使承包商保护自己的合法权益,追回损失的方式,分析了其几个原则(实际损失原则、合同原则、合理性原则、有利原则),并针对此提出了“总费用法”和“分项法”这两个计算方法,可供施工单位在今后工程索赔中借鉴。
2.
Authors analyze treatment principles and cost determination and calculation methods which should be adopted when supervision engineers treat contractors cost claims.
详细分析了监理工程师在承包商的费用索赔中的处理原则和费用认定与计算方法,为监理工程师的工作开展提供了很好的依据。
3.
Through the analysis of several cost claim cases during the construction of Xiaolangdi water project, the authurs studied the contract basis of cost claim calculation, cost composition and specific calculation methods, and expressed some views dealing with the problems concerned cost claim.
本文通过对小浪底工程发生的几项具体费用索赔事件的分析,探讨了费 用索赔计算的合同基础、费用组成及具体的计算方法,并就费用索赔的处理提出 了一定见解。
6)  cost claims
费用索赔
1.
Calculation of cost claims in construction delay claims;
工程延误费用索赔的计算
补充资料:《矿产资源补偿费征收管理规定》


《矿产资源补偿费征收管理规定》
provision on the administration of the collection of the mineral resouces compensation

  kuangehan ziyuan buehangfei zhengshou guanli guiding《矿产资源补偿费征收管理规定》(provision。。theadnlinistration of lhe eolleetion of the而nelal resoucesCon〕pensation)国务院1 994年2月27日发布,同年4月1日起施行。共22条,另附费率表。主要内容包括:①矿产资介 《矿产资源补偿费征收管理规定》 (《人民日报》 1994年3月6日)源属国家所有,开采矿产资源必须按照本规定向国家缴纳矿产资源补偿费。②矿产资源补偿费由地质矿产主管部门会同财政主管部门征收,地质矿产主管部门负责具体征收工作,财政主管部门负责征收的监督工作。③矿产资源补偿费按照矿产品销售收人的一定比例计征。④采矿权人应按照规定的义务、纳费期限、结算方式和纳费对象及其费率标准缴纳矿产资源补偿费。⑤征收的矿产资源补偿费应及时、全额、就地上缴中央金库,年终按规定的比例中央与地方分成,单独结算并纳人国家预算实行专项管理,主要用于矿产资源勘查。⑥免缴或减缴矿产资源补偿费,必须报经省级人民政府地质矿产主管部门会同同级财政主管部门批准。⑦采矿权人采取伪报矿种、隐匿产量、销售数量或伪报销售价格、实际开采回采率等手段,不缴或少缴矿产资源补偿费的,将处以加征滞纳金、罚款的处罚,情节严重的,吊销其采矿许可证。(殷德仁)
  
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条