1) load case
计算工况
1.
Determining the load case for dynamic analysis of tower crane s structure system;
塔式起重机结构体系动态分析计算工况的选择
2) varying condition calculation
变工况计算
1.
Based on the analyses of those existed calculation methods for turbine varying condition, the paper gives a sequential varying condition calculation that starts with steam extraction of the final stage or the second final stage (superheated steam condition).
通过对已往的汽轮机变工况计算的方法分析,该文提出以汽轮机末级抽汽或次末级抽汽(过热蒸汽状态)为计算起点的汽轮机的顺序变工况核算方法。
2.
Base on the analyses of those existed calculation methods for turbine varying condition,we give a sequential varying condition calculation that starts with steam extraction of the final stage or the second final stage(superheated steam condition).
通过对已往的汽轮机变工况计算方法分析,提出以汽轮机末级抽汽或次末级抽汽(过热蒸汽状态)为计算起点的汽轮机的顺序变工况核算方法。
3.
Based on the analyses of those existed calculation methods for turbine varying condition,the paper gives a sequential varying condition calculation that starts with steam extraction of the final stage or the second final stage(superheated steam condition).
通过对已往的汽轮机变工况计算方法的分析,提出了以汽轮机末级抽汽或次末级抽汽(过热蒸汽状态)为计算起点的汽轮机顺序变工况核算方法。
3) off-design
偏离设计工况,偏离计算工况,非设计工况,变工况
4) off-design condition calculation model
变工况计算模型
5) design point
设计点,设计工况,计算点,计算位置
6) design condition
设计工况
1.
When design condition is different from the rated condition, it is necessary to check the capacity of the terminal unit under the design condition to ensure it is matched with the request.
设备设计工况与额定工况不同时,必须对设备的实际制冷能力进行校核,以保证实现设计目的。
2.
Especially at non-design condition, the works of matching and controlling inner para.
首先分析设计工况时涡轮机动力系统,在满足鱼雷动力系统的各项外部条件(如鱼雷航深、航速等)和内部条件(如涡轮机功率、效率,燃烧室压力、温度,转子机械强度等)的前提下,建立起设计工况涡轮发动机的数学模型,编程计算并确定涡轮机内部机械结构和燃气热力学状态各参数。
补充资料:洪水调节计算(见水库调洪计算)
洪水调节计算(见水库调洪计算)
hongshui tiaojie洪水调节计算J ISUan 见水库调洪计算。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条