1) *"Staggered floor section
错层部位
2) partial dislocation
局部位错
3) partial dislocation
部分位错
1.
It is known that LC and RC containing the reconstruction defect(RD) move faster than the left kink(LK) and right kink(RK),which validates our previous conclusion that RD can promote the motion of the 30° partial dislocation.
计算结果表明,含有重构缺陷(RD)的LC和RC相对于左弯结和右弯结具有较快的运动速度,验证了之前得出的RD对30°部分位错的运动具有加速作用的结论,并且通过对弯结运动过程中微观结构的分析,从微观尺度上对这一结论进行了解释。
4) stagger arrangement
错层位
1.
Research on full-seam mining adopted roadway layout of stagger arrangement in thick coal seam;
厚煤层错层位巷道布置采全厚采煤法的研究
2.
Stable characters of key stratum in stagger arrangement roadway layout top-coal caving mining;
错层位巷道布置放顶煤开采关键层的稳定特征
3.
The feasibility of stagger arrangement caving mining in gently inclined thick-seam is analyzed through resemble simulation experiment.
通过实验室相似模拟 ,分析较薄厚煤层错层位巷道布置采煤法的可行性 ,以及巷道和围岩的运移规律 ,为以后的工业性试验和现场应用提供数据。
5) dislocation layer
位错层
6) displacement damage
位移层错
补充资料:人脑的功能分化猫小脑不同部位的兴奋引起身体相应部位的活动
李瑞端绘
[图]
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条