说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 词典 -> 分段铺设
1)  broken-up laying
分段铺设
2)  segmented design
分段设计
1.
A new design method-the segmented design method for drying system was put forward.
提出了分离过程的分段设计法:将一个任务分解为多个子任务,根据各个子任务的不同特点进行设计。
2.
The water treatment process was studied by the segmented design method.
采用分段设计法研究水处理过程。
3)  Subsection design
分段设计
1.
Analysis of the subsection design of the porous wall of a transpiration cooling nozzle;
发汗冷却喷管多孔壁面的分段设计分析
4)  segmental installation
分段埋设
5)  railway building by stages
分段建设
1.
First, it gives the method of founding the multi - objective dynamic programming model of railway building by stages for a two -stage railway.
本文针对铁路分段建设问题,首先从有两个区段的新建铁路入手,探讨了铁路分段建设多目标动态规划模型的阶段划分方法,然后提出了有n个区段新建铁路的分段建设多目标动态规划模型的阶段划分途径,并进一步分析了模型目标值的确定问题。
6)  Sectional design
分段设计
1.
To the permanent magnet linear synchronous motor (PMLSM) for vertical hoist movement, thearticle studies the sectional design and raises the mind of optimizing single motor firstly then the section.
本文针对垂直运输系统用永磁直线同步电动机进行分段设计研究,提出了首先对单台电机进行优化设计,然后进行分段式优化设计的思路。
补充资料:《铺设海底电缆管道管理规定》


《铺设海底电缆管道管理规定》
regulations on management of laying submarine cables and pipelines

  Pushe haidi dianlan guandao guanli guiding《铺设海底电缆管道管理规定》(regulationson~a-gelllent ofl娜飞submanne eables and pi州ines)l卿年2月11日国务院颁布,自1989年3月1日起施行。其宗旨在于维护中华人民共和国主权和海洋权益,有序地铺设和保护海底电缆、管道,合理地开发利用海洋空间。中国海洋行政主管部门是铺设海底电缆、管道及为此所进行的“路由”调查、勘测与有关活动的主管机关。该规定在实际管理中,需根据不同管理对象和不同情况区别对待。对于中国的企业、事业单位铺设海底电缆、管道的活动,主管机关主要对其所要铺设的“路由”实施审批,以实现科学、有序的铺设和正常使用与保护;对于外国的公司、企业和其他经济组织或个人在中国的内海、领海范围内铺设海底电缆、管道以及为铺设所进行的“路由”调查、勘探活动,则必须按规定事先向主管机关提出书面申请,获准后方可实施。外国作业者在中国大陆架上进行上述活动,除应事先通知主管机关外,其最后确定的“路由”须经主管机关同意。此外,该规定对海底电缆、管道的保护、维修、改造、拆除和废弃也作了相应的规定,并将收集海底地形、海上构筑物分布等方面的资料以及提供咨询服务作为主管机关的义务加以规定。 (赵恩波)
  
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条