说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 词典 -> 临时方案
1)  temporary monitoring method
临时方案
2)  temporary pile structure
临时桩方案
1.
During the rebuilding of South Jetty at Shuaiba Oil Pier, a temporary pile structure was dopted as the deep sea bracing structure, which was also used as the temporary bearing structure for removing the old structure as well as rebuilding the structure, thus cutting down the construction cost and improving the working efficiency.
在科威特舒艾拜油码头南码头的重建工程中 ,经过方案优选 ,用临时桩方案作为深海支撑结构。
3)  scratch file
临时档案
4)  Extraordinary Interim Emergency Programme
临时特别紧急方案
5)  clinical protocols
临床方案
6)  timing plan
配时方案
1.
As a result, it is necessary to model, analyze and simulate the urban traffic network in order to obtain an optimal or better traffic light timing plan.
交通信号灯是交通控制的主要手段之一,为了得到最优或比较理想的交通信号配时方案,有必要对城市道路交通网络进行建模、模型分析和仿真运行。
2.
The problem of modeling and simulation of traffic light timing plans at an intersection for the general case based on timed Petri nets is addressed in this paper.
针对一般情况提出一个建立道路交叉口交通信号配时方案时延Petri网模型的方法。
3.
Consequently,the performance index could be calculated with less effort for a given traffic timing plan and different timing plans could be compared in order that an optimal or suboptimal traffic control plan might be chosen.
这样,就可以对各种具体的信号配时方案的性能指标进行比较和评估,以便找出最优或比较理想的交通控制方案。
补充资料:关于临时建设和临时用地

临时建设是指必须限期拆除、结构简易、临时性的建筑物、构筑物、道路、管线或其他设施;临时用地是指由于建设工程施工、堆料或其他原因,需要临时使用并限期收回的土地。批准临时建设和临时用地的使用期限,一般均不超过两年。
临时建设和临时用地都对城市规划的实施产生重要的影响,因此,城市规划行政主管部门必须对城市规划区内的临时建设和临时用地进行严格的规划管理。任何单位和个人需要在城市规划区内临时使用土地或进行临时建设都应当征得城市规划行政主管部门的同意,不得影响城市规划的实施。
鉴于临时建设和临时用地的情况比较复杂,各地的管理体制和管理条件又不尽相同,因此,《城市规划法》第三十三条规定:“在城市规划区内进行临时建设,必须在批准的使用期限内拆除。临时建设和临时用地具体规划管理办法由省、自治区、直辖市人民政府制定。”
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条