说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 词典 -> 三渣
1)  lime-fly-ash macadam filler
三渣
1.
This article analyzed processing of lime-fly-ash macadam filler through allocating, material sellection, mixture controlling, spreading and compacting mechanization, loose coefficient, thickness, water content control and segregation treatment etc.
本文从外环线一期工程二灰稳定碎石(以下简称三碴)配比、选料、混合料控制、机械化摊铺、碾压、松铺 系数、厚度、含水量控制及产生离析现象的处理等多方面进行了阐述,从而使三渣基层施工达到了最佳控制途径, 道路平整度检测均方差为0。
2)  lime flyash concrete base
三渣基层
1.
Initial studies are made on the mechanism of crack formation in the lime flyash concrete base, and external factors.
三渣基层裂缝的成因机理及外部因素影响进行了初步研究。
3)  3-dreg subbase course
三渣底基层
1.
A brief introductions is made to the structure of the subbase course materials on the former pavement of Taihu Main Road in Wuxi city, the results of the sample screening tests on the subbase course materials of the 3 dregs (crushed stones, loess and lime), and the principle of the cold regeneration of the 3-dreg subbase course in the design of the new pavement.
 简要介绍了无锡市太湖大道原路面基层材料的结构、三渣底基层材料取样的筛分式试验结果、新路面设计中的三渣底基层冷再生原理。
4)  pulverized fuel ash three-slag
粉煤灰三渣
1.
According to the role of industrial waste material (waste plaster) to pulverized fuel ash three-slag composite the paper approaches to the modified problem of pulverized fuel ash three-slag composite.
根据工业废料(废石膏)对粉煤灰三渣混合料的作用,探讨粉煤灰三渣混合料的改性问题。
5)  three constituent mixture
三渣混合料
1.
Described in this paper are the features, mix ratio, strength test, construction process and the key points in construction for modified three constituent mixture of waste plaster.
文章阐明了废石膏改性三渣混合料的特点、配合比、强度检测、施工工艺流程以及施工注意事项。
6)  oil/water/solids separation
油水渣三相分离
补充资料:干渣渣
1.缺乏水分而呈渣屑的样子。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条