1) technical specification for concrete structures of high-rise building
高层建筑混凝土结构技术规程
1.
The main points of new specification are discussed by comparing the present and previous technical specification for concrete structures of high-rise building.
通过对比分析新老高层建筑混凝土结构技术规程,阐明新规程须重点掌握的内容,提出须进一步补充完善的建议。
2) concrete structures in high-rise buildings
高层建筑混凝土结构
1.
Ductility issue of concrete structures in high-rise buildings;
高层建筑混凝土结构的延性问题
3) reinforced concrete tall building structure
钢筋混凝土高层建筑结构
1.
In reinforced concrete tall building structures, the sections of the frame columns are larger and their shear-span ratios are smaller due to the limitation of the axial-compression ratio of the columns.
在钢筋混凝土高层建筑结构中,由于柱轴压比的限制,框架柱的截面大、剪跨比小,在结构底部经常形成短柱甚至超短柱,短柱延性差,地震时易发生脆性剪切破坏而导致结构破坏甚至倒塌。
5) high-rise concrete building
高层混凝土结构
1.
Discussion on the structural design of high-rise concrete building in nine seismic fortification intensity
浅谈九度区高层混凝土结构设计
6) RC high-rise building
钢筋混凝土高层建筑
1.
In connection with a RC high-rise building, a 3-D finite-element model is used in nonlinear time-history analysis.
采用有限元模型,对某钢筋混凝土高层建筑进行非线性时程分析,分别计算了基础固定模型和基础隔震模型的结构自振特性、地震记录下的非线性特性等。
补充资料:采用可拆卸预应力锚杆技术进行高层建筑基坑护坡
采用可拆卸预应力锚杆技术进行高层建筑基坑护坡
霹 采用可拆卸预应力锚杆技术进行高层建筑基坑护坡
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条