1) bar chart
横道图
1.
According to a bar chart and activity-on-arrow network in different building parts construction, the different calculated project durations between flow process plan and network plan are introduced and their differences are presented in essence.
分别用流水进度计划中横道图的方法与网络计划中双代号网络图的方法安排分段施工的进度计划 ,得出不同的计算工期 ,揭示出流水进度计划和网络计划安排进度计划的实质差异 ,然后提出流水网络计划使得流水进度计划与网络计划达到统
2.
For the expression of process schedule in flow construction management,the schedule is inflexible when bar chart is used,and complicated when CPM used.
流水施工的进度计划采用横道图表达,不尽科学、合理,采用普通网络图表达,比较繁杂。
3.
Combining with domestic methods and their strengths of bar chart and network chart,and through absorbing foreign plan management experiences as reference,the progress controlling method of "status report C" is put forward,which is used in A320 airbus engineering.
通过吸收、借鉴国外工程技术人员计划管理的方式与经验,结合国内横道图和网络图的方法与优势,提出"状态报告C"进度控制法,应用于空中客车A320系列飞机中国总装线工程中。
2) Network transverse lined diagram
网络横道图
3) bar graph schedule
横道图进度表
4) linked bar chart program
有联系的横道图
5) Linked Bar Chart
带链接的横道图