1)  payoff tensioner
放线张力装置
1.
On the improved design of payoff tensioner;
浅谈放线张力装置的改进设计
2)  tension controlled pay-off
张力控制放线装置
3)  thread tension device
纱线张力装置
4)  shaftless constant tension pay-off
无轴式恒定张力放线装置
5)  tension device
张力装置
1.
Nonlinear finite element modeling of the tension device in the skin pass mill for hot strip
平整分卷机组中张力装置的非线性有限元建模
2.
The functional principle,main features of tension device on warping wachine are introduced,the product adaptability and existed problems are discussed.
文章介绍了现代整经机各类张力装置的作用原理、主要特点、品种适应性及存在问题。
6)  Tension stringing
张力放线
1.
Tension stringing is important working procedure that the transmission line project contracts, the quality of stringing not only relates to the builder s quality, matural environment, construction method and measure, but also ensufres line safe operation s main precondition.
张力放线是输电线路工程施工的重要工序 ,其放线质量不仅与施工人员素质、自然环境、施工方法及所采取的措施有关 ,而且也是保证线路安全运行的主要前提。
2.
during the tension stringing construction for Wuhu Yangtze River Large Crossing in±500 kV Long-Zheng transmission line.
文章介绍了± 5 0 0kV龙政线芜湖长江大跨越张力放线施工中 ,牵张设备、牵引绳、放线滑车等的受力计算 ,以及大跨越张力放线前需要进行哪些方面的计
3.
According to requirements of 8-bundle conductors stringing work in ultra high voltage transmission line construction,one-drag-eight tension stringing technology has been researched and developed,which was successfully applied in the first internal ultra high voltage transmission line construction.
根据特高压输电工程八分裂导线施工需要,研究开发了"一牵八"张力放线这一先进的导线张力放线施工技术,并在国内首条特高压输电工程中得到了应用,取得圆满成功。
补充资料:放线验线应注意哪些事项

放线验线时应注意以下五点注意事项:
1、先放线后验线。应当坚持先放线后验线的程序。一般建设工程项目可按照周围的参照物,由施工单位放线,施工放线后,建设单位向城市规划行政主管部门申请验线并报形式日期,城市规划行政主管部门的管理人员到现场验门的勘测队伍进行放线,放线后经规划管理人员验线。
2、作好放线验线记录。无论由谁放线、验线、都必须作好放线、验线记录。
3、在放线的过程中,对验线时需要查验的关键点必须打上固定标志。
4、放线时,原地上需要拆除的建筑物、构筑物应当全部拆除掉。
5、地形复杂的用地,应平整后再放线。