说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 词典 -> 桩基逆作法
1)  pile foundation in inverse order during construction
桩基逆作法
1.
Starting from the practice of a pile foundation in inverse order during construction,the laws of sharing loads are studied.
桩基逆作法的工程实践出发 ,探讨了桩基逆作中荷载的分配情况。
2)  composite pile foundation in top-down order
逆作法复合桩基
1.
The model tests on series of single-pile,two-pile and four-pile foundations were designed to investigate the relation between bearing capacity and settlement under ultimate load and the load share ratio between soil and pile of the composite pile foundation in top-down order.
通过对单桩、两桩以及四桩的逆作法复合桩基室内模型试验,研究在极限荷载作用下逆作法复合桩基的荷载与沉降关系及桩、土荷载分担特性。
3)  rigid piles-composite foundation by reverse construction process
逆做法刚性桩复合地基
1.
The loading behaviors of the rigid piles-composite foundation by reverse construction process before and after sealing piles are analyzed respectively; and equations to calculate the stress ratio and the depth of the neutrality point are deduced.
分析表明,对于逆做法刚性桩复合地基,调节桩土应力比(或桩土荷载分担比)可通过控制桩土间的沉降差(即封桩时间)、置换率及桩长来实现。
4)  complex foundation in top-down order
逆作法复合基础
5)  semi-inverse method
半逆作法
1.
And through comparing them,it decides the construction of using discontinuous arranging piles inner supporting and semi-inverse method,introduces the construction process and points of molten iron pouring,and points out that the program shortens the time limit of the project,and decreases the costs,and it values to prompting and application.
针对某炼钢厂铁水倒罐坑的施工难点,提出了5种施工方案,通过对5种方案的比较,确定采用间断排桩内支撑支护、半逆作法施工方案,详细介绍了铁水倒罐坑的施工流程及其施工要点,指出该方案既缩短了工期,又降低了成本,值得推广使用。
6)  reverse construction method
逆作法
1.
Artificial borehole diaphragm wall and reverse construction method are adopted according to the characteristics.
根据此特点,选择人工成孔地下连续墙逆作法施工。
2.
In this article, authors introduce the design style and placement principles of middle support columns in deep foundation ditch reverse construction method, the structural construction method and technical methods for joints formed between these middle columns and structural bars.
重点介绍深基础逆作法的中间支撑柱设计的形式及其设置原则 ,它与工程结构杆件形成节点的构造作法及其所采取的技术措
3.
Special reverse construction method,semi-reverse method and normal method were jointly adopted in deep foundation pit excavation of subway station He-nan-zhong-lu,Shanghai.
上海地铁河南中路站工程深基坑挖土采用特殊的逆作法、半逆作法和顺作法组合施工技术 ,通过地墙位移、支撑轴力、建筑物沉降等监测数据综合分析 ,结合深基坑施工时间和空间效应对位移的控制 ,制定技术措施 ,调整施工方案 ,确保了周边环境的安全。
补充资料:就地拌和桩法
      利用搅拌和高压将需要处理的地基土和固化剂拌和,通过固化剂的水化、离子交换、团粒化、硬凝等反应就地加固软土的方法。常用的固化剂有水泥、石灰、活性工业废料、硅酸钠水溶液(水玻璃)。施工方法分深层搅拌法和高压喷射法。
  
  深层搅拌法  通过特制的深层搅拌机械,在地基中就地将软粘土(含水量超过液限、无侧限抗压强度低于0.005兆帕)和固化剂(多数用水泥浆)强制拌和,使软粘土硬结成具有整体性、水稳性和足够强度的地基土。根据上部结构的要求,可对软土地基进行柱状、壁状和块状等不同形式的加固。施工过程如图1。
  
  
  深层搅拌机一般由双层管组成,外管下端带叶片,靠管上端的电动机带动旋转,内管供输送水泥或生石灰。中国制造的SJB-1型深层搅拌机(图2)系采用三管并列,两侧管各带二叶片式搅拌头,中央管除支承两侧管外还兼作输浆管用。一次加固面积0.7~0.8米2,加固深度可达10米(改型后,加固深度大于15米)。深层搅拌法施工时,除深层搅拌机外,尚需起吊设备、固化剂制备泵送系统(灰浆搅拌机、灰浆泵、冷却水泵、管道等)、控制操纵台等设备。
  
  
  软粘土经此法加固后,强度可提高10~20倍。滨海地带的软粘土上建造荷载较轻的建筑物时,用此法较适宜。
  
  高压喷射法  利用高压喷射流切削土体,及灌浆杆的旋转和升降,使土体在原位与固化剂搅拌混合均匀,凝固后在地基中形成直径约0.6~1.2米的圆柱体,也称旋喷桩。意大利的比萨斜塔的地基,即是用旋喷桩加固的。喷射管有单管、二重管(外管喷压缩空气、内管喷浆状固化剂)、三重管(外管喷压缩空气、内管喷浆状固化剂、中间管喷高压水切削土体)。高压喷射法克服了传统压入法的缺点,可较准确地控制浆液的用量、浓度和处理范围,可用于砂性土和粘性土。此外,尚可用于基坑施工止水,防止涌土、流砂、坍土。
  

说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条