1)  concrete arch dam
毛石混凝土拱坝
2)  Stone
毛石
1.
Quality Control of Stone Base Construction;
毛石基础施工的质量控制
3)  rubble-built structure
毛石砌体
1.
The quality problems of rubble-built structure were analyzed in detail, and quality control measures were put forward in terms of design, construction management and concrete construction operation.
对毛石砌体的质量问题进行了详细的分析,并就设计、施工管理及具体施工操作方面提出了质量控制措施。
4)  rubble foundation
毛石基础
1.
The paper describes the normal problems occurred in rubble foundation.
介绍了毛石基础的常见质量问题 ;在施工中只有严格按照施工规范操作 ,才能保证毛石基础的砌筑质量 ,提高房屋的耐久性和安全
2.
The quality control of rubble foundation may be ensured from a key link of which are select material conscientiously and satisfy the needs of mortar plumpnessand soon,thus the reliability of fuilding is guaranteed.
从认真选材、砌筑砂浆饱满度的要求以及毛石砌筑方法和质量控制等主要环节入手,便可以保证毛石基础的质量,从而保证建筑物的可靠性。
3.
It is presented that strip rubble foundation can be used under the door pillars when concrete door pillars are required by greater entrances on ground floor.
介绍在砖混结构的建筑中,一层部分有较大洞口需设计成混凝土门柱时,往下可应用条形毛石基础,使整个建筑的基础形式相同,整体性好,施工方便,减少混凝土用量。
5)  rubble stone
乱石,毛石
6)  rubble dam
毛石坝
参考词条
补充资料:拱坝应力分析


拱坝应力分析
stress analysis of arch dam

  gongba yingli fenxi拱坝应力分析(stress analysis of arehdam)研究拱坝坝体和地基在各种荷载作用下的应力和变形的方法。在拱坝设计中,拱坝体形和厚度的选择,混凝土标号及地基软弱部位的加固等,均须参照应力分析的结果来确定。拱坝的应力分析,包括数学分析、结构模型试验和原型观测。原型观测是在已建成的坝上进行观测,了解其工作安全状况,校验设计结果,并为以后的科学研究提供资料。 拱坝由于结构复杂,小型工程可采用拱冠梁法。对于大型工程,过去多采用拱梁试(分)载法和结构模型试验。薄拱坝有采用有限差分法的。20世纪70年代起,逐渐采用有限单元法。 为了统一标准,在规定最大设计应力的同时,须规定应力分析方法。因拱坝的应力分布和最大拉、压应力,常随分析方法而改变。考虑各国已建成的大型拱坝都有拱梁试(分)载法的计算结果,拱坝应力分析如采用拱梁试(分)载法,可与已建拱坝进行对比,便于作出安全的评价。 拱梁试(分)载法将空间壳体化为杆系来计算,力学概念明晰,在计算过程中,能逐渐了解其力学机理,便于修改体形和调整厚度,但只能算出坝体应力。在分析地震反应、孔口影响及地基不均匀性等方面,不如有限单元法好。目前,国内外均有拱梁试(分)载法和有限单元法的通用程序。一些大型拱坝设计,常同时采用这两种方法,有时还辅以结构模型试验。
  