1) Huangcaoba Reservoir
黄草坝水库
1.
Disposal technology of deep mixing pile cutoff wall for the Huangcaoba Reservoir;
黄草坝水库深层搅拌水泥桩截渗墙处理技术
2) auxiliary dam of Huangbizhuang Reservoir
黄壁庄水库副坝
1.
Collapse causation analysis of the auxiliary dam of Huangbizhuang Reservoir;
黄壁庄水库副坝塌陷原因分析
3) Huangcaoba
黄草坝
1.
At Huangcaoba landslide,a high bridge is constructed and related engineering plan and measures have also been suggested in the Guiyang-Zunyi super highway.
本文即以贵遵线经过黄草坝古滑坡段的高架桥工程勘察为例,分析滑坡稳定性及其对工程的影响,提出相应的工程方案和防治措施建议。
4) reservoir dam
水库大坝
1.
Introduction on emergency preparedness plan of reservoir dam safety management;
水库大坝安全管理应急预案浅谈
2.
Quality control of consolidation project of Xiaohekou reservoir dam in Yicheng;
翼城小河口水库大坝加高培厚工程中的质量控制
3.
Influence of 5·12 earthquake on Fengjiashan reservoir dam;
浅析“5·12”地震对冯家山水库大坝的影响
6) Zhongba Reservoir
中坝水库
1.
Preliminary Analysis on Rehabilitation of the Water Conveyance Tunnel of Zhongba Reservoir;
浅析中坝水库输水隧洞除险加固工程
补充资料:福建省第二座碾压混凝土坝——龙门滩一级水库
福建省第二座碾压混凝土坝——龙门滩一级水库
目 福建省第二座碾压混凝土坝— 龙门滩一级水库
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条