说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 词典 -> 阻尼精确计算
1)  damping accurate estimation
阻尼精确计算
2)  precise calculation
精确计算
1.
With the analytic method,the expressions for the precise calculation of buoyancy and its center of lau.
分析了导管架下水运动过程中杆元的各种状态,用解析的方法推导出导管架下水运动过程中的浮力和浮心的精确计算公式,提高了导管架下水参数计算及其模拟的精度。
2.
The first is definition of ITO; the second is definition of block resistance; the third is precise calculation of ITO resistance, and the fourth, analyzing the factors affecting the ITO resistance.
论述了ITO、方块电阻的定义及ITO阻值的精确计算 ,并结合实际应用讨论了影响ITO阻值的因素 ,对版图设计和LCD生产的过程控制有一定的借鉴意义。
3)  accurate calculation
精确计算
1.
A method for accurate calculation of the absorption coefficients of optical materials;
一种精确计算光学材料吸收系数的方法
2.
The formula for accurate calculation on the theoretical value of elongation for the post-tensioning prestressing steel has been derived from the principle of prestress losses due to friction.
运用预应力摩擦损失原理,推导出后张预应力钢筋理论伸长值的精确计算公式,在改进和完善《公路桥涵施工技术规范》(JTJ041-2000)有关后张法预应力钢筋理论伸长值计算方法的同时,显著提高了其计算精度,为保证预加应力的准确可靠,提供了重要的理论依据。
3.
This paper describes virtual value calculation error of AC/DC converter, analyzes the reasons behind the calculation error, advances a method of accurate calculation and provides an example of the calculation.
指出相控AC/DC电路感性负载时有效值计算一般方法的误差问题,分析了引起误差的原因,研究了精确计算方法,给出了算例。
4)  exact calculation
精确计算
1.
An exact calculation method is put forward to determine the influence quantity of single-laye.
以工程中计算连续梁的一次力矩分配法的概念和思路为基础,建立了结构中杆端真实抗转刚度和结点转角传递的概念及其相应计算公式,提出了一种单层多跨刚架超静定结构影响量的精确计算方法。
5)  Damping calculating
阻尼计算
1.
Damping calculating is key for dynamic calculating model analysis,especially for response analysis.
最后给出了阻尼计算的实例。
6)  imprecise computation
非精确计算
1.
Checkpointing scheme based on imprecise computation for real-time systems;
基于非精确计算的实时任务检查点设置策略
2.
Computing quality-assured fault-tolerant scheduling of imprecise computation tasks;
基于非精确计算的保证计算质量的容错调度
3.
The imprecise computation technology divides the real-time tasks into compulsive and optional execution parts,so the time of optional execute part can turn into the obligate time of the compulsive part.
采用非精确计算技术,将实时任务分为强制执行部分和可选执行部分,将可选执行部分的处理部分作为强制执行部分的容错操作预留处理时间。
补充资料:洪水调节计算(见水库调洪计算)


洪水调节计算(见水库调洪计算)


hongshui tiaojie洪水调节计算J ISUan 见水库调洪计算。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条