1) method of TBM
掘进机法
1.
The main methods for the construction of tunnel are usually both the traditional drilling and blasting method and the modern method of TBM, which have their own applicable conditions concerned.
隧洞施工的主要施工方法是传统的钻爆法和现代的掘进机法,各个方法均有其不同的适用条件。
3) roadheader
掘进机
1.
Moving simulation of loading process of star wheel loading mechanism of roadheader;
掘进机星轮装载过程的运动模拟
2.
Failures tree and reliability analysis of roadheader spray system;
掘进机喷雾系统的故障树与可靠性分析
3.
Analysis of the main factors affecting the performance of a roadheader;
影响掘进机性能的主要因素分析
4) tunneling machine
掘进机
1.
Theory and realization of supervision and control system for tunneling machine;
掘进机上位机监控系统的研究及实现
2.
It mainly introduces the failure diagnosis and elimination of travel unit of S200 tunneling machine applied in mixed coal-rock drift and coal-rock drift.
着重介绍半煤岩巷及煤岩巷使用的S200型掘进机行走部的故障诊断及排除方法。
3.
Based on the mechanical model of single bit, drilling loads on the cutting head of tunneling machine are simulated by means of computer in this paper.
基于单个截齿的受力模型,对掘进机截割头钻进工况载荷进行了计算机模拟,为截割头的结构设计和参数优化提供了理论依据。
5) heading machine
掘进机
1.
Comparison of features and performances of longitudinal cutting head and transverse cutting head of heading machine;
掘进机纵横两种截割头的特点及其性能比较
2.
Improvement of Sloo heading machine cool system;
S100型掘进机冷却系统的改进
3.
Measurement and analysis on the vibration of the electronic central box of underground heading machine;
井下掘进机电控箱的振动测试分析
6) Tunneller
掘进机
1.
Diagnosis and remove of the faults to walking part on MRH-S100-41 tunneller;
MRH—S100—41型掘进机行走部故障的诊断和排除
2.
This paper introduces the main technical parameters,structures and technical featur es of EBJ-120TP type tunneller.
介绍了EBJ-120TP型掘进机的主要技术参数、结构及其技术特点。
补充资料:立井联合掘进机
见普通凿井法。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条