1) Do not slot and construct
不开槽施工
2) trench excavation
开槽施工
1.
The article illustrates the way to well construct urban drainage pipeline from the requirements and methods of trench excavation,groove construction in pipeline construction,selection of drainage pipeline foundations and project quality and safety control,which has significance to increase composite service ability of the pipeline and purify urban environment.
从开槽施工的要求和方法、管道施工中的河槽施工、排水管道基础的选用、项目质量及安全控制等方面对如何建设好城市排水管道进行了阐述,对提高综合化服务能力和净化城市环境等方面具有重要的意义。
3) construction with chained slot-cutting machine
链式开槽机施工
4) examination of foundation pit excavated
施工验槽
1.
The examination of foundation pit excavated is the important procedure for the first phase of the construction of structure after the foundation pit being excavated.
施工验槽是建筑物施工第一阶段基槽开挖后的重要工序,也是一般岩土工程勘察工作最后一个环节,根据在秦皇岛地区参加施工验槽的实践经验,简述施工验槽的目的、工作内容、要求和方法,对常遇到的地基问题进行归纳总结、分析讨论,并提出浅层地基可行的处理方法。
5) trench construction
成槽施工
1.
Combining with the work practices,the trench construction process of the machine is introduced,and compared with the traditional hydraulic grab bucket.
结合工程实际,对该技术成槽施工的各个环节进行了介绍,并与传统的液压抓斗施工技术进行了比较,当地质情况相同时,双轮铣比液压抓斗施工更方便、快捷,施工质量更高,有待进一步推广应用。
2.
As an example of underground continuous wall construction, this paper introduced the underground continuous wall construction technology, detailed the training wall construction, slurry trench construction, holes clearing, and the unit slot segment joints connections process, especially for the groove construction and achieved the desired results in final.
以某地下连续墙工程为例,着重介绍了该地下连续墙的施工工艺,详述了导墙施工、成槽施工护壁泥浆、清孔、以及单元槽段接头连接等工艺,特别是对成槽施工部分的处理进行了深度研究,取得了理想的效果。
6) aqueduct construction
槽身施工
补充资料:槽壁法施工
在松软地层中建造地下连续墙的施工方法。从地面上沿预定墙身位置,使用专用机具(抓斗或钻孔机等)分段挖槽,槽内用泥浆护壁,借泥浆循环或机械方法出土。挖成6~8米一段深槽后,放入钢筋笼和接头模型,并在泥浆内应用导管浇灌混凝土。如此逐段进行挖槽筑壁便建成连续的钢筋混凝土墙,称为“地下连续墙”。常用于建造地下建筑工程的基坑挡土墙、工程结构的边墙和水利工程的大坝防渗墙等。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条