说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 词典 -> 缆芯截面
1)  cable core cross-section
缆芯截面
1.
Selection of 220 kV two-phase power supply cable core cross-section for electrified railway;
电气化铁路220kV二相供电电缆缆芯截面的选择
2)  cable section
电缆截面
1.
The article discusses the factors of choosing the cable section,and describes the necessity for choosing the cable section in according to the economical opertion.
针对电缆截面选择的多种因素 ,探讨了按照经济运行方式选择电缆截面的必要
2.
To select the over-sized cable section for the storage battery circuit would make it difficult to construct.
如蓄电池回路电缆截面选择过大会造成施工困难。
3)  cross-section of cable
电缆截面
1.
In the light of the problems existing in the selection of the cross-section of cable by using conventional methods, this paper makes a comparison between the cables with different cross-sections, sums up the method of selecting the optimized cross-section of cable and the merits of this method in selecting the cross-section of cable.
针对常规做法选择电缆截面存在的问题 ,对不同截面电缆进行了比较 ,并总结了电缆最佳截面的选择方法及据此方法选择电缆截面的优
4)  Cross section of core
铁芯截面
5)  large section cable
大截面电缆
1.
Taking the trial project of 220 kV Wanping underground substation as the example,the technology of replacing the 35 kV SF6 GIL(Gas Insulated Transmission Line) with the 1200 mm2 large section cable is studied.
介绍了采用双拼1200 mm2大截面电缆替代35 kV SF6气体绝缘输电线路(GIL)通管作为35 kV GIS开关柜与主变压器的连接应用。
6)  core area of section
截面核芯面积
补充资料:Z8612热芯盒射芯机操作规程
1、遵守铸造设备通用操作规程。
2、工作前还必须遵守:
a、
检查设备上行程开关和碰块的位置是否正确,如不正确,必须调整。
b、
接通电源,打开压缩空气伐门,先用手动方法,对各机构逐进行点动试车,然后用自动方法,进行一个循环试车,确认一切正常后,方可进行生产。
3、工作中还必须遵守:
a、
在设备开动后,一个循环未完成时,不许中途调整电器,以免发生误动作,造成设备人身事故;
b、
设备的每一个循环后,必须用喷咀清除芯盒上残存的砂子,并喷涂分型剂;
c、
在未切断电源和所气源前,不准将手伸入芯盒和夹紧器之间的空隙处,或把手放在导轨上,以免发生人身事故。
d、 一般不准空射,如必须空射,一定要把压缩空气伐门关小;
e、 如果用手操作,不准同时操作两个电器开关。
4、工作后还必须遵守:
a、
操纵各个电器开关,使设备各机构恢复到原始位置,然后切断电源和气源;
b、 折下射砂头,清理积砂和粘砂;
c、 清除排气塞内的粘砂;
d、
取下射砂筒,清除缝隙中的粘砂,最后用石蜡涂擦内壁,但不要将缝隙堵塞;
e、 清除闸板上的积砂,并在闸板上涂石墨粉,以减少磨擦;
f、 清除导轨和导杆上的积灰和积砂,并涂上一层润滑油。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条