说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 词典 -> 接节
1)  connecting segement
接节
2)  joint detail
连接细节
1.
Two different representative joint kinds specimens about joint detail of composite horizontal tail are tested by static test、fatigue test、residual strength test and strain measurement.
通过对两类不同典型连接形式的复合材料平尾连接细节试件进行静力、疲劳、剩余强度试验,并对其进行了应变测量,对所测数据以及试件的破坏模式进行综合分析,从而得出复合材料平尾典型连接细节疲劳性能的试验结论。
3)  lap joints
搭接节点
1.
Experiment on fatigue properties of one-side covering plate lap joints;
单面盖板搭接节点的疲劳性能试验
4)  welded joint
焊接节点
1.
Review and analysis of researches on bending behavior of welded joint of steel tube truss;
钢管桁架焊接节点的抗弯性能研究综述和分析
2.
Behavior of welded joint of trussed columns with multiple web members in the National Stadium;
国家体育场桁架柱内柱多腹杆焊接节点性能研究
3.
Experimental study on the mechanical properties of aluminum welded joints;
铝合金焊接节点力学性能的试验研究
5)  connection [英][kə'nekʃn]  [美][kə'nɛkʃən]
连接节点
1.
Nonlinear finite element analysis of CFRT connection with dentation plate;
钢管混凝土梁柱齿状钢板连接节点非线性有限元分析
2.
Based on the model tests and numerical calculation,mechanic behavior of connection between composite beam and concrete shear wall in the main building of Achieves Exhibition Hall of Pudong New District in Shanghai is studied.
以上海市浦东新区文献中心主楼组合梁与混凝土剪力墙新型连接节点为对象,通过模型试验和数值分析研究了大尺寸方钢与混凝土剪力墙的共同工作性能。
3.
To guarantee the safety of structural design, a small scale model for a new type of connection between steel beam and concrete shear wall was designed and tested under monotonic loading.
针对一种新型的钢梁与混凝土墙体的连接节点,设计缩小比例模型,并对其进行静载试验和有限元分析,试验结果和有限元分析结果吻合较好。
6)  connection joint
连接节点
1.
Nonlinear finite element analysis on connection joint of a super high-rise building
某超高层结构连接节点的非线性有限元分析
2.
In this article,authors introduce connection joint types between main cable and secondary cable in cable net structure.
介绍了索网结构中主次索之间的连接节点形式,并根据国内工程实践中常用的外包PE的半平行钢索的应用情况提出了有针对性的构造上的改进,同时结合工程实例进行了讨论。
3.
Combining with practical projects, the author introduce the quality control and specific construction method of connection joints between beams, slabs, walls of underground structures and underground continuous walls in construction of the "Reverse Construction Method".
结合工程实例,介绍深基础逆作法施工中地下结构的梁、板、墙与地下连续墙连接节点的具体做法及质量控制。
补充资料:星接阻抗和三角接阻抗的变换


星接阻抗和三角接阻抗的变换
transformation between starc-onnected and delta-connected impedances

x ing]一e乙日kongl介e sonJ一00}Iez日伙ongde匕一。一〕huon星接阻抗和三角接阻抗的变换(t ransfor-mation betweenstar一eonneeted and delta-eonneeted imPedanees)接成星形的三个阻抗和接成三角形的三个阻抗互相替代的等效变换。它们之间的关系可用一组变换公式表示。按这组公式,用星接阻抗替换三角接阻抗或者反过来,不会影响稳态下电路其他部分的正弦电压和电流,常用于对称三相电路的分析和计算。 图1为三个阻抗21、Z:、23接成星形(又称丫形)。图2为三个阻抗Z小22。、Zal接成三角形(又称△形)。它们之间的变换公式如下:人23土图1星接阻抗图2三角接阻抗(1)将星形连接变换成三角形连接212一Z:+22+2 122及3一22+za十警(1)、|冬|矛231一23+21+2321(2)将三角形连接变换成星形连接z、-二一典乒兴-) 艺‘2士乙“3十乙31…_2 oqZI,}Z。一下万~一二-二二-汁 乙‘2士乙23十乙3‘1_Z。IZoq}艺q一二二一~二,二二--,-二二-~J 乙12十乙23十艺32夕(2) 当三个星接阻抗相等,即21一Z:一23一z丫、三个三角接阻抗相等即212一223一231一Z△时,变换公式是 Z二一32丫,Z丫一Z△/3
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条