说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 词典 -> 底部两层框架
1)  frame structure at lower two stories
底部两层框架
1.
Based on the model experiment results of one masonry building with frame structure at lower two stories, a FEM model is analyzed in this paper.
本文以某底部两层框架砖房模型试验为基础,采用有限元方法对整体结构进行了计算分析,研究了结构底部两层框架抗侧刚度变化对结构动力特性的影响,讨论了结构地震反应变化的规律。
2)  two stories frame-shear wall structure at the bottom
底部两层框架-抗震墙
3)  multi story building with R.C. frame in the first and second stories
底部两层框架砖房
4)  brick masonry building at first two stories
两层底框架砖房
5)  multistory building with RC frame in the first and second stories
底部二层框架
1.
In this paper, the shaking table experimental results of 1/5 scale model of a multistory building with RC frame in the first and second stories are presented.
本文简述了底部二层框架上部四层砖房 1/ 5比例模型的模拟地震振动台试验,对模型的试验结果进行了分析,并评价了该结构的抗震性能。
6)  building with frame-wall structure at first stories
底部两层框架-抗震墙房屋
补充资料:多层厂房预制钢筋混凝土框架结构安装


多层厂房预制钢筋混凝土框架结构安装
installation of precast reinforced concrete frame structure for multilayer workshop building

定.11 ~.。」:柱1一可下门- 杯形井礴11铆椒,甲丫一目一一丫 位板沙父父护科月黔今了牛’J一一确r一一土- 二黑交哪嗯浮i钊粼减图“连接板埋设件连接法 图1柱子固定示意图柱子四面的连接板和埋设件,然后进行连接板外表面 的刷油和涂装。 由于混凝土的抗弯性能所限,混凝土柱不能过长。梁和板的安装在第一节柱安装完成后,及时将对较高的多层框架柱,一般都设计成多段,在预制厂分预制梁、板安装好,以尽快形成整体框架,保持结构的节制作,运至现场后,由安装者在高空对接成整根柱。稳定。梁与柱的连接多采用柱肩梁承接式,通过梁端头这种多节柱安装的关键在于柱与柱之间对接接口的施上下两面的埋设件与柱的埋设件焊接、固定(图4)。梁工,常用的接口型式有湿式连接(图2)和连接板埋设固定后,将预应力钢筋混凝土板座落在梁上,通过将大件连接(图3)两种。(1)湿式连接法。起吊前先实地板两端下边的埋设件与梁上面的埋设件焊接在一起,量测预留钢筋接头的尺寸,将接头调直,开好坡口;将将板固定起来(图5),使框架形成一个空间刚体。如接头处的混凝土面打毛处理,在柱头上事先系3一4根此逐层依次施工,直至完成多层厂房框架结构的全部缆绳,用于调整柱子就位后的垂直度。起吊后将上下柱安装工作的钢筋接头对准,并用两台经纬仪同时测量柱子相邻丁粉可-两面的垂直度,用缆绳进行校正。垂直度合格后进行对!」下称焊接,先焊接头支承面的钢板埋设件,再焊柱子四角!华卜一,一一洲二二的钢筋和全部对接钢筋,然后复核上下柱中心的垂直1七口,杏一一.州.去盛,度,若无偏差立即支模灌浆。(2)连接板埋设件连接法。IJ}}将柱子起吊后与下柱对准就位,并用两台经纬仪同时!//~测童校正相邻两面的中心线垂直度,合格后进行焊接。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条