1) vibro-squeezing sand pile
振动挤密砂桩
1.
The paper takes the project as an example,and uses the method of taking the rate of filling sand as the parameter to design the vibro-squeezing sand pile for treating the foundation of liquefaction.
该文结合工程实例 ,采用以灌砂率为参数的方法设计振动挤密砂桩处理液化地基 ,经检测 ,不仅消除砂土液化且提高了单桩承载力 ,为减少混凝土桩提供了必要条件 ,从而降低了成本 ,提高了经济效
2) vibro-compaction granular pile
振动挤密砂石桩
1.
Based on the treatment practices of sandy soil foundation with vibro-compaction granular piles for the large oil tanks of Maoming Petrochemical Company in Maoming City,Guangdong Provinces,ome problems about the design of vibro-compaction granular piles are discussed.
基于振动挤密砂石桩加固茂名石油化工公司多座大型油罐砂性地基的工程实践,首先探讨了振动挤密砂石桩设计理论的几个问题;然后根据现场测试资料分析了地基加固效果。
3) viborsinking sand-gravel compaction pile
振动沉管挤密砂石桩
4) vibratory dense-squeezing pile
振动挤密桩
5) vibroflotation sand compaction pile
振冲挤密砂桩
1.
Base on the geological condition,this paper analyzes some probably ground treatment methods,especially discusses pile form,pile length,bearing capacity and settlement of vibroflotation sand compaction pile.
根据220kV彩塘变电站的工程地质条件, 分析了几种可能的地基处理方法, 重点论述了振冲挤密砂桩的布桩型式、桩长、承载力与沉降验算。
6) compacted sand pile
挤密砂桩
1.
Based on the analysis of the liquefied mechanism of saturated sand,this paper analyzes the effect of three measures such as compacted sand pile,vibro replacement gravel column and bag sand-well.
在分析饱和砂土液化机理的基础上,结合工程实例探讨挤密砂桩、振冲碎石桩、袋装砂井3种处理方法,优选出挤密砂桩法,使该路段砂土液化地基处理既经济又可靠。
2.
This paper comprehensively introduces the principle and the role of compacted sand pile in the reinforcement of the soft foundation based on the construction of the second contract section of Bao-Xi Railway,and describes the existing problems and their solutions.
系统地介绍了挤密砂桩加固软弱地基的原理和作用,并结合包西铁路第二标段的实践,阐述了施工中存在的问题及解决办法。
补充资料:挤密碎石桩加固地基
挤密碎石桩加固地基
挤密碎石桩加固地基
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条