1) observation period
观测周期
1.
According to the problems in deformation observation of buildings, the author makes an analysis in three aspects: precision decision,observation period and point location for deformation observation,and puts forward some opinions.
该文针对工程建筑物变形观测中的若干问题 ,从变形量测定精度的确定、变形观测周期的选取以及变形观测点的布设三个方面进行了分析与探讨。
2) difference of the observing and measuring cycle
观测周期差
3) macro-cycle
宏观周期
4) cycle measurement during a day
周日观测
1.
86 km, 605 m, 311 m) by the high precision distance measure system is simply introduced, which combines the cycle measurement during a day and real time baseline calibration.
简要介绍用高精度测距系统 ,结合周日观测和实时基线校准来完成 1 。
5) test period
测试周期
1.
Considering the effect of the pre-test and post-test period,applying the convolution integral derived from Duhamel principle,an explicit solution is obtained.
考虑前后测试周期的影响,应用Duhamel原理得出卷积积分的显式解。
补充资料:大坝内部变形观测(见水工建筑物变形观测)
大坝内部变形观测(见水工建筑物变形观测)
daba neibubianxing guanCe大坝内部变形观测见水工建筑物变形观测。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条