1) demineralized water workshop
除盐水厂房
1.
The demineralized water workshop was the first BOP workshop to be designed, built, erected and commissioned with relatively complex design and many difficulties in Lingou Nuclear Power Station.
除盐水厂房是岭澳核电站BOP厂房中最先设计、施工、安装和调试的厂房,技术含量比较高。
2) demineralizer building
除盐器厂房
4) workshop fume cleaning
厂房气楼除尘
5) hydropower house
水电站厂房
1.
Simulation analysis of temperature control on hydropower house monolith of some water power station in river channel;
某河床式水电站厂房坝段温控计算分析
2.
Application of air change ventilation system in hydropower house;
置换通风系统在水电站厂房中的应用
3.
As a special load,seismic shock can directly influence the design of hydropower houses.
以三峡左岸水电站厂房为例,依托现行的抗震设计规范考虑混凝土材料的开裂,采用人工地震波生成技术和时程分析方法对整个地震过程中的厂房结构地震响应进行研究。
6) hydropower plant
水电站厂房
1.
Especially, the vibration induced by fluctuating pressure in the tunnel of hydropower plant is worthy of investigation.
随着水电事业的不断发展,电站单机容量和厂房尺寸不断增大,由此可能引发的水电站厂房结构的振动问题非常令人关注,特别是厂房流道内的脉动压力引起的结构振动值得研究。
2.
This paper described the feasibility and disadvantages of PKPM application for the structural design of hydropower plants with the transformation of existing load factor through differences with DL norms and GB norms,discussing how to more rational use of PKPM design soft to the structural design of hydropower plants.
通过DL规范与GB规范的差异比较,说明了现行荷载系数转化应用PKPM进行水电站厂房结构设计的可行性与其弊端,探讨如何更加合理的利用PKPM程序来进行水电站厂房结构设计。
3.
Hydropower Station plant is an important part of the building,due to design or construction of negligence resulting in leakage of water,which impact the use of hydropower plant function and life.
水电站厂房是水电站建筑物的重要组成部分,因设计或施工方面的疏忽而造成渗漏水,影响水电站厂房的使用功能和使用寿命。
补充资料:内吸除(见单晶片的吸除技术)
内吸除(见单晶片的吸除技术)
internal gettering
内吸除internal gettering见单晶片的吸除技术。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条