1)  unit ramp loss
机组爬坡约束
2)  ramping constraint
爬坡约束
3)  ramping rate constraints
爬坡速率约束
4)  unit operating constraints
机组约束
1.
Power generation companies’ (Genco) bidding strategy should consider the optimality in an entire period of time due to the unit operating constraints coupling over times.
由于机组约束的存在,发电商在制定竞标策略时不能仅仅针对单个时间点进行优化,还应考虑到这一决策对相邻时段的影响。
5)  Ramp Rate Constraint
爬升约束
1.
A new systematic method based on the necessary and sufficient condition for a unit commitment to be feasible is proposed for solving the unit commitment problem with ramp rate constraints.
根据具有爬升约束机组组合可行的充分必要条件,在Lagrangian松弛方法的框架下,给出了一种获得具有爬升约束的机组组合问题可行解的重新寻经的新的系统方法。
6)  ramping constraints
爬升约束
1.
Individual thermal unit sub-problem with ramping constraints is very difficult to be solved because the generation levels of two consecutive hours are coupled.
有爬升约束单火电机组子问题由于相邻两时段的发电量互相耦合,其最优化求解是十分困难的。
2.
By using this method, the optimal scheduling problem of generation units with ramping constraints can be solved efficiently.
还给出了该法在电力系统优化调度中的应用实例 ,根据仿真试验表明 ,可成功地解决有爬升约束发电机组的优化调度问题 ,能得到问题的最优解 ,算法的效率较高。
补充资料:波浪爬坡高度


波浪爬坡高度
wave run-up on slope

bolang PaPo gaodu波浪爬坡高度(wave run一up on slope)波浪沿斜面爬升的垂直高度,如图中场所示,简称波浪爬高。波浪爬高的大小直接影响土石坝坝顶高程的确定。波浪爬高 波浪爬高的数值与波浪要素(波高及波长)、斜面坡度、护面材料、水深及风速等因素有关,需通过计算确定。其计算方法有规则波法与不规则波法两类,前者把波浪及其爬高作为大小不变的均匀系列;后者则将它们看作大小不等的随机系列,并采用其统计特征值来表示。过去工程设计中多采用规则波法,用比较简单的经验公式进行计算,但结果比较粗略。不规则波法的计算原理是:考虑到波浪要素在时段内的变化,找出其统计分布规律,按土石坝的不同级别,分别采用不同累积概率(工程中也称保证率)时的爬高值作为设计波浪爬高。(王玺)