1) parallel gap lightning protection device
并联间隙防雷装置
1.
The parallel gap lightning protection device (PGLPD) is installed on overhead transmission lines to protect insulator strings against being burnt by power frequency electric arc when the lines meet lightning strokes or power frequency flashover of insulator.
在架空输电线路上安装并联间隙防雷装置,能够在线路遭遇雷击或绝缘子串工频闪络时有效地保护绝缘子串免受工频电弧的灼烧。
3) rester with parallel gaps
带并联间隙避雷器
4) parallel gap
并联间隙
1.
The parallel gap lightning protection device on 35kV overhead transmission lines can prevent insulators and conductors from being burned by power frequency arc caused by lightning stroke.
35kV架空线路并联间隙防雷装置能有效保护绝缘子串和导线免于雷击引起的工频续流电弧的烧蚀,但该装置的安装是否会影响架空线路单相接地故障电弧的自熄特性尚需探讨。
2.
To reduce the damage of insulators and fittings caused by power frequency follow current after lightning flashover,a parallel gap lightning protection device for 110 kV and 220kV overhead transmission lines was developed.
研制了适用于我国110kV、220kV架空输电线路的并联间隙防雷保护装置,用于减小雷击闪络后工频续流电弧对绝缘子和金具的损坏。
3.
For protecting the insulators from the possible damage caused by lightning flashover and pollution flashovers which are followed by high power arc current,the parallel gap lightning protection devices can be installed on insulators strings.
绝缘子串雷闪或污闪后,后续的工频电弧会烧伤甚至损坏绝缘子,为此研究了用于保护绝缘子的并联间隙防雷保护装置。
5) prevent a lightning stroke
装置防雷
6) lightning protection device
防雷装置
1.
The three composing parts of the gridconnected solar photovoltaic power station,such as solar panels,grid-connected inverters and lightning protection devices were introduced.
对太阳能光伏发电市电并网电站的太阳能电池板阵列、并网逆变器和防雷装置3个组成部分进行了介绍。
2.
The parallel gap lightning protection device on 35kV overhead transmission lines can prevent insulators and conductors from being burned by power frequency arc caused by lightning stroke.
35kV架空线路并联间隙防雷装置能有效保护绝缘子串和导线免于雷击引起的工频续流电弧的烧蚀,但该装置的安装是否会影响架空线路单相接地故障电弧的自熄特性尚需探讨。
3.
Based on thoroughgoing study on <Design Standard on Building s Lightning Protection>and designing practice of several years,this paper puts forward some suggestions about the differentiation of environment, utilization of building s reinforcing bars as lightning protection devices, and arrangement of lightning receiver, etc.
本文在深入学习《建筑物防雷设计规范》GB5 0 0 5 7— 94的基础上 ,结合多年的设计实践 ,就环境的区分、利用建筑物钢筋作为防雷装置以及接闪器的布置等提出了一些看
补充资料:防雷装置施工
防雷装置施工
construction of lightning protection device
fanglel zhuangzh{shlgong防雷装置施工(eonstruetion of lightningProteetion diviee)将雷电安全导入大地以保护建(构)筑物、露天工业设施、电力设备以及人身安全的装置的施工过程。防雷装置包括避雷针、避雷网(带)、避雷线(含架空地线)和各种避雷器等。 避雷针施工避雷针是防直击雷的装置,其作用是将雷电流引向自身,并使之经接地引下线和接地体安全泄入大地。避雷针通常是将用镀锌钢管或圆钢及其它金属物制成的针状物焊接在钢板上而成,可安装于建(构)筑物的顶上,如烟囱、水塔、冷却塔、高炉、浮动式贮罐等顶上的避雷针,或安装于单独竖立的钢筋混凝土杆或铁塔上,再自其底座焊一引下线接到接地体上即成独立避雷针。如避雷针底座焊在钢或钢筋混凝土结构物或杆塔上,则可利用钢构件或钢筋作引下线。引下线要尽量短而直,如需要弯曲时,弯曲开口处的距离不得小于或等于弯曲部分线段实际长度的。.1倍。引下线宜在距地面约1.sm以下处设断接卡,以便测量接地体的接地电阻。在引下线易受机械损坏的地方和地面上1.7m至地面下o.3m的一段应加保护设施;如采用钢件保护,不得在其周围构成闭合磁路。独立避雷针、烟囱避雷针等要设独立的接地体,并与其他工作接地或保护接地装置的距离不应小于3m,否则应在规定条件下,将两者相连。防雷装置采取自下而上的施工程序,先施工接地装置、引下线,最后安装避雷针,以免施工期间遭受雷击。 避雷网(带)施工敷设在高大建(构)筑物顶上或顶层内的网(带)状防雷金属物体分明装和笼式两种:(l)明装。将金属网(带)设在高大建(构)筑物顶上及其四周的女儿墙上,作为接闪器。土建施工时,应按施工图埋设预埋件,敷设的金属网、带要与预埋件焊牢,与屋顶上所有金属件连成一体,并立即连接到接地体上,以防不测的感应过电压。各引下线的间距要均匀。其它要求与避雷针引下线相同。(2)笼式避雷网带。是利用钢筋混凝土屋面板、梁、柱及基础内的钢筋组成一个完整的防雷网。将屋面板作接闪器、柱内钢筋为引下线,基础作接地装置,构件内部钢筋的连接要绑扎紧固或焊接牢靠,以保证连成电气通路。钢结构高层建筑和厂房的梁柱与金属屋面本身就是一个完整的笼式防雷体系。 避雷线施工在长形建(构)筑物上空或高压输电线路上方架设接地裸导线,用以防止遭受直接雷击或感应雷击。避雷线通常采用镀锌钢绞线。其引下线及接地装置的施工要求与避雷针相同。有关架空线路避雷地线的施工见架空线路施工。 避雷器施工避雷器是一种限制雷电过电压和操作过电压的保护电器。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条