说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 词典 -> 材料组成与设计
1)  material combination and design
材料组成与设计
2)  material composition design
材料组成设计
3)  Design of structure and composition of materials
结构和材料组成设计
4)  material composition design method
材料组成设计方法
1.
In order to realize composition character of high modulus asphalt concrete(HMAC),the material composition design method of HMAC in France was analyzed,special adjustments about grade type,molding method,determination of the optimum asphalt content,certification tests of Marshall design method were conducted and were verified with Marshall test,rutting test,moisture damage test and modulus test.
为更加系统地了解高模量沥青混凝土材料的组成特性,分析了法国高模量沥青混凝土材料组成设计方法,从级配类型、成型方法、沥青用量的确定和验证试验等方面对中国马歇尔设计方法进行调整,并经过了室内马歇尔试验、车辙试验、水损害试验和模量试验的验证。
5)  Materials and structural design
材料与结构设计
6)  material design and fabrication
材料设计与制备
补充资料:设计洪水地区组成


设计洪水地区组成
regional combination of design flood

sheii hongshui diqu zueheng设计洪水地区组成(regional eombinationof design flood)流域的分区之间设计洪水的遭遇与组合。解决诸如水库泄洪与下游区间洪水的遭遇,串联或并联水库群的洪水组合、利用分洪道进行流域与流域之间的洪水调度的可能性分析等等课题。设计洪水的地区组成,通常采用数理统计方法,一般都要分析各分区之间和各分区与全流域之间的洪水的相关程度,以确定各分区和全流域的频率组合方式。为此,必须首先分析全流域(工程设计断面以上)及分区的洪水频率,进而对各地区的洪水组成进行综合分析。 分析方法有:①典型年法。从实测资料中选择具有某种代表性的典型年(如洪水主要来自上游或主要来自区间或暴雨均匀分布的洪水类型等)先求出全区设计洪水的放大比值,再以同一比值对全区及各分区的实测洪水过程放大,作为设计情况下的洪水地区组成成果。本法未经统计概括,由于时间和空间分布的随机性,放大以后成果是否合理,要分析论证。②同频率法。如果全区(指下游工程控制断面以上)是由A、B两个分区所组成,其洪水组成常采用同频率法。先分别计算八区、B区及全区的洪水频率,绘制频率曲线,并以全区分别与A、B区分析相关系数,如果A区与全区相关较好,则令全区与A区水量同频率发生,并算出B区相应水量及相应频率;反之,可以求出A区相应水量及相应频率,有时两种组合均需计算。算式如下: 全区与A区同频率: W刀=W(P)一W乃(P) 全区与B区同频率: W月=W(尸)一W刀(P)式中W、W,、WB分别代表全区、A区、B区水量;尸为设计频率。 当分区在两个以上时,可在多个的分区中,选择相关较好的分区,令其水量与全区同频率,其余分区则参照典型年法。根据各分区典型年的分配比例,以剩余总水量,用同一比值缩放。 上述分析方法,尚不能充分反映设计洪水错综复杂的遭遇情况.据以获得的分析成果,仍须进行如下的合理性检验:①分区复合的洪水过程应与全区设计断面的洪水过程线基本吻合;②放大后的分区水量以及全区与分区的洪水组合都应可能发生。此外,天然情况下的洪水地区组成,和工程建成后经过调节的洪水组成不同。因此,洪水的地区组成因工情而变,不同设计频率的洪水地区组成也是不同的。 (李鸿业胡昌新)
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条