1) international hydroelectric project claim
国际水电工程索赔
1.
Application of data warehouse to international hydroelectric project claims;
数据仓库应用于国际水电工程索赔中的设想
2) international hydropower project
国际水电工程
1.
Due to the effect of the circumstances,such as the geography,the laws,the culture & religion,the politics & the economy of the country where the project is situated,the international hydropower project is characterized with its unique complexity and uncertainty.
国际水电工程项目因受所在国的地理环境、法律环境、文化与宗教及政治经济等社会环境的影响而具有其独特的复杂性和不确定性,工程总承包具有非常高的项目风险。
3) engineering claims
工程索赔
1.
The paper makes comparison amd amalysis on the traditional quantitative methods for delay s general management expenses in the international engineering claims.
本文对国际工程索赔中常用的延期总部管理费定量方法进行了比较分析,并对几种主要方法作了深入的研究,指出其局限性,提出了改进Hudson公式。
4) project claim
工程索赔
1.
On how supervising engineers handle project claim problem;
监理工程师在工程索赔中的定位
5) engineering claim
工程索赔
1.
The application of engineering claim in railway engineering;
工程索赔在铁路工程中的应用
2.
Research and practice of training students consciousness and competence of engineering claim;
培养学生工程索赔意识和能力的研究与实践
6) construction claims
工程索赔
1.
Application of NNS in international construction claims;
国际工程索赔中神经网络的应用
2.
The study of construction claims of our country at present;
我国现阶段的建筑工程索赔研究
3.
Application of LMBP predictive model in international construction claims;
LMBP预测模型在国际工程索赔上的应用
补充资料:国际工程承包索赔证据材料
国际工程承包索赔证据材料
国际工程承包索赔证据材料索赔成功的关键是有充分的证据材料和精确地计算出损失的数额,说明这些数据是合情合理的。通常索赔依据的材料有:①定期与业主雇聘人员的谈话记录。②来往信件(有关工程内容的)。③各种施工进度表。④施工备忘录。⑤业主与承包人(含总包与分包)定期或临时的会议详细记录。⑥注有拍摄日期的工程照片。⑦驻地工程师填写的施工记录表忍工资、薪金单据。⑨工程检查、验收报告。⑩所有合同文件。@施工人员计划表和人工日报表忿施工用材料、设备的使用报表。除以上工程资料外,承包人还应建立科学、完整、准确的会计制度,加强对每项工程的财务管理及时向公司提供有价值的成本资料,以便及时抓住索赔时机,准确计算索赔额。其会计资料应有人工分配表、工人福利协议书、材料立单、收讫发票、总分类帐、财务信件、经会计师检证的财务决算表、工程预算、工程成本报告、工程内容变更通知等。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条