1) increasing electricity output
增发电量
1.
Several countermeasures are recommended for reducing abandoned water and increasing electricity output during peak regulating period in Mid-China power system, and linking with some practical cases, the feasibility of these measures is studied.
在华中地区水能资源及水电开发利用现状的基础上 ,针对华中电网调峰矛盾突出、水电弃水调峰损失电量大等问题 ,提出了华中电网减少水电弃水增发电量的对策和建议 ,并结合实际分析了可行性和合理性。
2) water saving and electric energy output increasing
节水增发电量
3) incremental generating cost
发电成本增量
4) Incremental development
增量开发
1.
This paper briefly introduces the engineering theories of clean room software and discusses the function of incremental development in the project and conception of supporting the incremental develo.
本文简要介绍净室软件工程理论 ,并重点讨论增量开发在净室软件工程中的作用 ,最后谈了运用CORBA构建三层体系结构来支持增量开发的设
6) increasing hydropower
增加发电
补充资料:年发电量
年发电量
annual output of energy
n矛on fod}onl一ong年发电,(annual output of energy)从水电站发电机母线年送出的电量的总和,包括厂用电和物电损失。作为水电站特征值指标,一般指多年平均年发电t,即水电站年发电量的数学期望值。年发电量综合地表示水电站的能量效益。水电站的年发电量决定于河流的径流特性、水电站的利用水头、装机容贵、调节性能(含上游库的调节性能)、机组效率及系统运行特性.当水电站的建设方案确定以后,其年发电量,主要决定于每年的来水及其分配以及水牟运行方式。来水比较均匀或水库调节性能较好的水电站,每年的发电量差别较小,有利于电力系统的运行。年径流变化较大或调节性能较差的水电站,其枯水年与丰水年的发电量相差较大,影响水电站效益的发挥。 有效电量为水电站扣除厂用电和强迫弃水电量后电力系统利用的年发电量,又称电力系统可吸收电量,通过电力电童平衡求得。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条